Laserfiche WebLink
Scope of Services <br />The tasks below are intended to supplement and clarify the scope items in the RFP, and to demonstrate <br />phases of our services, tasks to be accomplished, and deliverables to be provided. Design plans <br />and reports indicated will follow the City's standard format, unless indicated otherwise. A drawing <br />list indicating anticipated sheet count is included with our fee in the separate sealed envelope. We <br />assume a 10-month schedule for design beginning December 2020 with design services completed by <br />September 2021. <br />"I Task 1: Project Coordination and Meetings <br />Kimley-Horn team members will attend one initial kick-off meeting to confirm project elements, <br />objectives, scope, and schedule; and attend progress development team (PDT) coordination meetings <br />at each submittal (up to three meetings) with the City. We will provide pertinent meeting minutes with <br />action items and will prepare monthly progress reports as part of the invoice package. <br />Kimley-Horn will prepare a Target Schedule in Gantt Chart format showing primary tasks and review <br />periods/processing, as agreed upon with the City. Kimley-Horn will maintain a Progress Schedule <br />showing actual progress versus target and provide it to the City on a monthly basis. <br />Task 1 Deliverables: Meeting agendas, meeting minutes, action items, progress reports, <br />invoicing, draft target schedule, and monthly progress schedule <br />Task 2: Record Research and Utility Coordination <br />Kimley-Horn will update record research data obtained as part of the Warner Avenue project and will <br />obtain readily available record drawings and data pertinent to the scope of services, such as GIS <br />mapping, as -built plans, and utility atlases. We will initiate the utility notification process early in the <br />design stages to identify potential conflicts. We will maintain a utility agency tracking list to indicate <br />the status of communication and add a contact list for substructure and utility owner -operators that <br />will also carry over to the specifications. We anticipate assisting the City with utility notification letters <br />consisting of the following: Prepare to Relocate Notice/Final Utility Notice Form and Notice to Relocate. <br />We assume that utility notices will be on the City's letterhead. Utility agency's fees are excluded <br />from this task. <br />Task 2 Deliverables: Utility agency tracking list and utility notification letters <br />& Task 3: Field Survey <br />The Kimley-Horn team will provide a supplemental topographic field survey to the existing surveying <br />completed for the Warner Avenue widening project at a scale of 1" = 20' for the project limits per <br />the exhibit in the RFP. This entails survey record collection, establishment of horizontal and vertical <br />controls, monument and centerline tie preservation, and verifying the City's provided right-of-way. Field <br />survey shots will consist of back of walk, top of curb, flow line, edge of pavement, crown lines, and <br />grade breaks at approximately 25-foot intervals, where needed. Existing right-of-way will be shown per <br />readily available records. <br />Task 3 Deliverables: MicroStation V81 Files of Topographic Survey, digital terrain model (DTM) of <br />existing surface features, and a PDF map signed by Licensed Surveyor in the State of California <br />City of Santa Ana TRRD77006.2020 Kimley>» Horn <br />