Laserfiche WebLink
Q Task 4: Water Quality Management Plan <br />Kimley-Horn will develop a Water Quality Management Plan (WQMP) for the project in compliance with, <br />and meeting the requirements of, Order No. R8-2009-0030 (Amended by R8-2010-0062) of the Santa <br />Ana Regional Water Quality Control Board. The WQMP will incorporate Low Impact Development (LID) <br />Best Management Practices (BMP) to the Maximum Extent Practical (MEP). Based on our preliminary <br />research, traditional LID BMPs cannot be incorporated. Therefore, appropriate proprietary BMPs will be <br />selected to improve water quality. If proprietary items are needed, these will be indicated in compliance <br />with the City's adopted public contracting code. <br />Task 4 Deliverables: Draft WQMP and Final WQMP <br />Q Task 5: Street Improvement Plans <br />The Kimley-Horn team will develop a street improvement plan for the construction of roadway <br />improvements for protected bike lanes within the project limits, per the exhibits in the City's RFP. The <br />plans will show typical sections, details, and horizontal and vertical (where needed) design information. <br />Roadway plans will be prepared at a scale of 1" = 20' horizontal and 1" = 2' vertical. Vertical design <br />information will be shown on plans with elevation call outs for details not shown on profiles. Plan <br />preparation will be coordinated with the City and other agencies. We assume the City will provide one <br />set of consolidated comments for each submittal. <br />Task 5 Deliverables: 30%, 60%, 95%, and 100% plans, electronic files in MicroStation <br />V81 and PDF (final plans will be sealed and signed) and responses to previous review <br />comments from the City <br />Q Task 6: Signing and Striping Plans <br />Kimley-Horn will prepare striping and signing plans at a scale of 1" = 40' for the proposed improvements <br />within the limits of the project, per exhibits in the City's RFP. Signing and striping plans will incorporate <br />lane lines reconfiguration and bikeway striping. Striping and signing plans will comply with the City's <br />standards, Caltrans, and the CA-MUTCD. <br />Task 6 Deliverables: 30%, 60%, 95%, and 100% plans, electronic files in MicroStation <br />V81 and PDF (final plans will be sealed and signed) and responses to previous review <br />comments from the City <br />Task 7: Traffic Control Plans <br />Kimley-Horn will prepare traffic control plans at a scale of 1" = 40' for the proposed bike lane <br />construction. The traffic control plans will be prepared in accordance with current CA-MUTCD, City <br />of Santa Ana, and Caltrans requirements and will be prepared at 20-scale (1" = 20') on a 24" x 36", <br />full-size sheet. <br />Task 7 Deliverables: 60%, 95%, and 100% plans, electronic files in Microstation V81 <br />and PDF (final plans will be sealed and signed) and responses to previous review <br />comments from the City <br />ffA Task 8: Opinion of Probable Construction Cost <br />Kimley-Horn will prepare an Opinion of Probable Construction Cost (OPCC) based on quantities, for <br />comparison to the project budget and assistance during the Contractor's bidding process. Unit prices <br />will be derived from readily available current bid information based on similar projects within the area. <br />Backup will be generated for lump sum items. <br />Task 8 Deliverables: 30%, 60%, 95%, and 100% OPCC, electronic files in PDF <br />Kimley»)Horn City of Santa Ana i TRRD77006.2020 <br />