My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPR No. 2020-04 <br />October 26, 2020 <br />Page 5 <br />Analysis of the Issues <br />Site Plan Review <br />The SAMC and Section 8.2 of the MEMU Overlay Zone require that the Planning Commission review <br />a site plan review application for any project proposed within an overlay zone. An analysis of the <br />required MEMU Overlay Findings and the project's compliance with the MEMU is provided in Table <br />4 on the following page. <br />Table 4; MEMU Findings for Site Plan Anprovall <br />That the proposed The development will activate a vacant and underutilized 8-acre site in the MEMU <br />development plan is consistent Overlay Zone. The project will create a new mixed -use development within close <br />with and will further the proximity to office buildings, Cabrillo Park, Mabury Park, and less than two miles from <br />objectives outlined in Section Downtown Santa Ana providing opportunities to live, work, and recreate. Each <br />1.2 for the MEMU Overlay building will be five -stories of residential units wrapped around a seven -level parking <br />Zone. structure. The height of the buildings will blend in with the heights of the nearby office <br />buildings which range from single -story, three-story and eight -story buildings and will <br />create an interface with the Santa Ana (1-5) Freeway. <br />The project will be built to California Building Code standards, which include energy <br />and water conservation measures and will improve pedestrian mobility by providing <br />new sidewalks and parkways along Fourth Street and Parkcourt Place. In addition, <br />the publically accessible linear park will serve as a link to the meandering trail along <br />Mabury Street and to Mabury Park to the north. Each building has a centrally located <br />bike room, and there is a rideshare pick-up/drop-off in the middle of the project site. <br />Additionally, the project is within walking distance of the OCTA Route 463 bus stop at <br />Fourth Street and Cabrillo Park Drive. <br />The commercial space has been designed with retail floor heights of 20 feet with <br />storefronts that will be visible from Fourth Street. In addition, the commercial space <br />links directly to an on -site public plaza at the corner of Fourth Street and Cabrillo Park <br />Drive which will include outdoor dining opportunities, decorative hardscape, specimen <br />trees and plantings, umbrellas, seating and lawn games. In addition, the ground floor <br />residential units along Cabrillo Park Drive will have doors and patios with direct <br />access to the street to help activate the street. <br />That the proposed The project is consistent with the development standards specified in Section 4 of the <br />development plan is consistent MEMU Overlay Zone including land use, stories, minimum development site area, <br />with the development building frontages, publically accessible open space, privatelcommon open space, <br />standards specified in Section building setbacks, and parking and access. The propose project is a mixed -use <br />4 of the MEMU Overlay Zone. development that has been well designed to fit within the Active Urban District. <br />Further, the access and egress for the project has been thoroughly review by the <br />Public works Agency for compliance with all applicable development standards. <br />That the proposed The project is consistent with the development standards specified in Section 5 of the <br />development plan is designed MEMU Overlay Zone. The building is desi ned with a high qualitydesign that includes <br />
The URL can be used to link to this page
Your browser does not support the video tag.