Laserfiche WebLink
SPR No. 2020-04 <br />October 26, 2020 <br />Page 6 <br />to be compatible with adjacent varied massing, changes in form, and is comprised of high quality material including <br />development in terms of metal siding, stone veneer, simulated wood siding, fiber cement lap siding, fiber <br />similarity of scale, height, and cement panels, stucco, metal and glass railings, and aluminum storefronts. During <br />site configuration and the development review process, the architectural design was peer reviewed by John <br />otherwise achieves the Kalisk[ Architects and City staff, which resulted in higher -quality building materials, an <br />objectives of the Design increase in the commercial square footage and a plaza at the corner of Fourth Street <br />Principles specified in Section and Cabrillo Park Drive. The project massing is broken into distinct building elements, <br />5 of the MEMU Overlay Zone. facades are broken up with the inclusion of private balconies, courtyards, and <br />contrasting building materials. The commercial storefronts are enhanced with <br />cornices and metal canopies and the primary access to the commercial uses will be <br />from Fourth Street. The project promotes pedestrian activity with landscaping and <br />publically accessible open space. Parking areas are screened from the street. Lastly, <br />over 40 percent of the units are over 1,000 square feet. <br />That the land use uses, site The project is consistent with the development standards specified in Section 7 of the <br />design, and operational MEMU Overlay Zone. The project has been designed to ensure compatibility between <br />considerations in the proposed the residential and non-residential uses on site. The commercial uses have separate <br />development plan have been entrances from the residential uses, and the parking management plan will manage <br />p[anned in a manner that will parking between the residential and nonresidential uses. Each building has a <br />result in a compatible and dedicated move -in and commercial loading area that will be screened with roll -up <br />harmonious operation as doors and controlled by the property management company. On site lighting will be <br />specified in Section 7 of the consistent with Chapter 8 of the Santa Ana Municipal Code (Building Security <br />MEMU Overlay Zone. Ordinance). <br />California Environmental (duality Act (CEQA <br />The 2007 Metro East Mixed -Use Overlay Zone Environmental Impact Report (EIR) (SCH No. <br />2006031041) and 2018 Subsequent EIR (SEIR) anticipated potential development of 5,551 <br />residential units, 963,000 square feet of commercial development, and 690,000 of office <br />development, The 2007 EIR and 2018 SEIR analyzed impacts related to aesthetics, <br />agriculture/forestry, air quality, biology, cultural resources, geology/soils, greenhouse gas <br />emissions, hazards and hazardous materials, hydrology and water quality, land use and planning, <br />mineral resources, noise, population/housing, public services, transportation/traffic, tribal cultural <br />resources and utilities. The EIR and SEIR concluded that there would be significant and <br />unavoidable impacts associated with air quality, noise, and transportation/traffic. <br />A traffic impact analysis was prepared for this project by Linscott Law and Greenspan which <br />analyzed the projects impacts on 25 intersections. Of the 25 intersections studied, the intersections <br />of (1) Fourth Street and the 1-5 northbound ramp and (2) Fourth Street and the SR-55 southbound <br />ramp are expected to have a significant impact under 2025 cumulative plus project conditions and <br />2040 buildout plus project conditions. As such, the off -site improvements listed in the anticipated <br />development potential description above apply to the project to reduce impacts below a level of <br />significance. In addition, a health risk assessment (HRA) was prepared by Urban Crossroads to <br />