My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.1.2 City of Tustin <br />For those study intersections within the jurisdiction of the City of Tustin, impacts to local and <br />regional transportation systems are considered significant if - <br />An unacceptable peak hour Level of Service (LOS) at any of the key intersections is projected. <br />The City of Tustin considers LOS D to be the minimum acceptable condition that should be <br />maintained during the peak commute hours. For this analysis, if the project increases traffic <br />demand at the study intersection by 1 % of capacity (ICU increase >_ 0.010), causing or worsening <br />LOS E or F (ICU > 0.901), the impact is considered significant. <br />7.2 Traffic Impact Analysis Scenarios <br />The following scenarios are those for which volume/capacity calculations have been performed at <br />the twenty-five (25) key intersections for existing plus project, near -term (Year 2025) and long-term <br />(Year 2040) traffic conditions: <br />A. Existing Traffic Conditions; <br />B. Existing Plus Project Traffic Conditions; <br />C. Scenario (B) with Improvements, if necessary; <br />D. Near -Term (Year 2025) Cumulative Traffic Conditions, <br />E. Near -Term (Year 2025) Cumulative plus Project Traffic Conditions; <br />F. Scenario (E) with Improvements, if necessary; <br />G. Long -Term (Year 2040) Future Traffic Conditions; <br />H. Long -Term (Year 2040) Future Traffic Conditions plus Project Traffic; and <br />I. Scenario (H) with Improvements, if necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.