Laserfiche WebLink
8.2 Year 2025 Traffic Conditions <br />Table 8-2 summarizes the peak hour Level of Service results at the twenty-five (25) key study <br />intersections for the Year 2025 horizon year. The first column (1) of ICU/LOS and HCM/LOS <br />values in Table 8-2 presents a summary of existing AM and PM peak hour traffic conditions. The <br />second column (2) lists projected cumulative traffic conditions (existing plus ambient plus related <br />projects traffic) based on existing intersection geometry, but without any traffic generated from the <br />proposed Project. The third column (3) presents forecast Year 2025 near -term traffic conditions with <br />the addition of Project traffic. The fourth column (4) shows the increase in ICU value and/or HCM <br />value due to the added peak hour Project trips and indicates whether the traffic associated with the <br />Project will have a significant impact based on the LOS standards and significant impact criteria <br />defined in this report. The fifth column (5) presents the resultant level of service with the inclusion <br />of recommended traffic improvements, where needed, to achieve an acceptable level of service. <br />8.2.1 Year 2025 Cumulative Traffic Conditions <br />Review of column (2) of Table 8-2 indicates that the addition of ambient traffic growth and related <br />projects traffic will adversely impact two (2) of the twenty-five key study intersections. The <br />remaining study intersections are forecast to operate at acceptable level of service during the AM <br />and PM peak hours. The intersections forecast to operate adversely consist of the following: <br />AM Peak Hour PM Peak Hour <br />Ka Intersection ICU/HCM LOS ICU/HCM LOS <br />1. Elk Lane at First Street -- -- 0.921 E <br />13. SR-55 SB Ramps at 41h Street 1.063 F -- -- <br />8.2.2 Year 2025 Cumulative Plus Project Conditions <br />Review of columns (3) of Table 8-2 indicates that four (4) of the twenty-five study intersections are <br />forecast to operate at unacceptable level of service during the AM and/or PM peak hours, based on <br />the LOS standards and impact criteria specified in this report, with the addition of project traffic. The <br />remaining study intersections are forecast to operate at acceptable level of service during the AM <br />and PM peak hours. The intersections forecast to operate adversely consist of the following: <br />Key Intersection <br />1. Elk Lane at First Street <br />8. I-5 NB Ramps at 4' Street <br />13. SR-55 SB Ramps at 411 Street <br />25. Cabrillo Park Drive at Park Court Place <br />AM Peak Hour PM Peak Hour <br />ICU/HCM LOS ICU/HCM <br />LOS <br />-- -- 0.929 <br />E <br />-- -- 0.904 <br />E <br />1.074 F -- <br />-- <br />-- -- 45.9 s/v <br />E <br />