Laserfiche WebLink
approval of the City of Santa Ana and Caltrans. Per City requirements, the Project may be <br />expected to pay a fair-share/local fee to cover the Project's fair share of the full construction <br />costs needed to implement these mitigation measures. <br />11.1.3 Year 2040 Buildout Plus Project Traffic Conditions <br />The results of the intersection capacity analyses presented previously in Table 8-3 shows that the <br />proposed Project is expected to have a significant impact at two (2) of the twenty-five (25) key study <br />intersections under Year 2040 Buildout Plus Project traffic conditions. As such, the following <br />intersection improvements are recommended to mitigate the impacts of the proposed Project under <br />these conditions. <br />■ No. 8 — I-5 NB Ramps at Fourth Street: Same as those identified in Section 11.1.2 — <br />Construct an additional westbound right -turn lane. Modify the existing traffic signal as <br />necessary inclusive any modifications to the traffic signal phasing. This improvement is <br />consistent with the Traffic Impact Study for the Metro East Overlay Zone in the City of Santa <br />Ana. This improvement is subject to the review and approval of the City of Santa Ana and <br />Caltrans. The proposed Project is expected to pay the full construction cost needed to <br />implement these mitigation measures which are reflected in the Project site plan and is <br />considered a "design feature". <br />■ No. 13 — SR-55 SB Ramps at Fourth Street: Same as those identified in Sections 11.1.1 <br />and 11.1.2 — Modify the eastbound shared through/right-turn lane to construct a free -right <br />turn lane. Modify the existing traffic signal as necessary. This improvement is subject to the <br />review and approval of the City of Santa Ana and Caltrans. Per City requirements, the <br />Project may be expected to pay a fair-share/local fee to cover the Project's fair share of the <br />full construction costs needed to implement these mitigation measures. <br />11.2 Project -Specific Improvements <br />The following improvements are being implemented as part of the proposed Project, which the <br />Project is expected to pay the full construction costs: <br />■ No. 9 — Cabrillo Park Drive at Fourth Street: Construct an exclusive southbound right - <br />turn lane. Modify the existing traffic signal as necessary. This improvement, which has been <br />incorporated in the Project site plan as a Project "design feature" is subject to the review and <br />approval of the City of Santa Ana. <br />As an alternative to the above mentioned improvement, subject to review and approval of <br />City staff, an option southbound through/right lane in addition to the proposed southbound <br />right -turn lane is proposed to minimize the southbound right -turning vehicles from impeding <br />the through traffic. <br />11.3 Recommended Circulation Enhancement <br />The following improvements are recommended to be implemented to enhance circulation within the <br />Project Vicinity, thereby maintaining acceptable operating conditions: <br />