My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval of the City of Santa Ana and Caltrans. Per City requirements, the Project may be <br />expected to pay a fair-share/local fee to cover the Project's fair share of the full construction <br />costs needed to implement these mitigation measures. <br />11.1.3 Year 2040 Buildout Plus Project Traffic Conditions <br />The results of the intersection capacity analyses presented previously in Table 8-3 shows that the <br />proposed Project is expected to have a significant impact at two (2) of the twenty-five (25) key study <br />intersections under Year 2040 Buildout Plus Project traffic conditions. As such, the following <br />intersection improvements are recommended to mitigate the impacts of the proposed Project under <br />these conditions. <br />■ No. 8 — I-5 NB Ramps at Fourth Street: Same as those identified in Section 11.1.2 — <br />Construct an additional westbound right -turn lane. Modify the existing traffic signal as <br />necessary inclusive any modifications to the traffic signal phasing. This improvement is <br />consistent with the Traffic Impact Study for the Metro East Overlay Zone in the City of Santa <br />Ana. This improvement is subject to the review and approval of the City of Santa Ana and <br />Caltrans. The proposed Project is expected to pay the full construction cost needed to <br />implement these mitigation measures which are reflected in the Project site plan and is <br />considered a "design feature". <br />■ No. 13 — SR-55 SB Ramps at Fourth Street: Same as those identified in Sections 11.1.1 <br />and 11.1.2 — Modify the eastbound shared through/right-turn lane to construct a free -right <br />turn lane. Modify the existing traffic signal as necessary. This improvement is subject to the <br />review and approval of the City of Santa Ana and Caltrans. Per City requirements, the <br />Project may be expected to pay a fair-share/local fee to cover the Project's fair share of the <br />full construction costs needed to implement these mitigation measures. <br />11.2 Project -Specific Improvements <br />The following improvements are being implemented as part of the proposed Project, which the <br />Project is expected to pay the full construction costs: <br />■ No. 9 — Cabrillo Park Drive at Fourth Street: Construct an exclusive southbound right - <br />turn lane. Modify the existing traffic signal as necessary. This improvement, which has been <br />incorporated in the Project site plan as a Project "design feature" is subject to the review and <br />approval of the City of Santa Ana. <br />As an alternative to the above mentioned improvement, subject to review and approval of <br />City staff, an option southbound through/right lane in addition to the proposed southbound <br />right -turn lane is proposed to minimize the southbound right -turning vehicles from impeding <br />the through traffic. <br />11.3 Recommended Circulation Enhancement <br />The following improvements are recommended to be implemented to enhance circulation within the <br />Project Vicinity, thereby maintaining acceptable operating conditions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.