Laserfiche WebLink
TABLE 11-1 <br />YEAR 2040 BUILDOUT PROJECT FAIR -SHARE COST CONTRIBUTION <br />(3) <br />Year 2040 <br />(4) <br />(1) <br />(2) <br />Buildout <br />Project <br />City/ <br />Time <br />Existing <br />Project <br />Plus Project <br />Fair -Share <br />Key Intersection <br />Jurisdiction <br />Period <br />Traffic <br />Traffic <br />Traffic <br />Percent26 <br />SR-55 SB Ramps at <br />Santa Ana/ <br />AM <br />3163 <br />78 <br />3,797 <br />12.30% <br />13. 4' Street <br />Caltrans <br />PM <br />Cabrillo Park Drive at <br />AM <br />-- <br />-- <br />-- <br />-- <br />25. Park Court Place <br />Santa Ana <br />PM <br />-- <br />-- <br />-- <br />100.00v27 <br />26 Project fair -share percentage Column (4) _ [Column (2)] / [Column (3) — Column (1)]. <br />27 As the intersection is not considered significantly impacted, the installation of the two-phase traffic signal shall be fully paid by the Project or the Project will implement the improvement. <br />