Laserfiche WebLink
TABLE 12-1 <br />PROJECT PERCENTAGE RADIUS OF INFLUENCE CMP ANALYSIS <br />(1) <br />(4) <br />CMP <br />(2) <br />(3) <br />Radius of <br />LOS "E" <br />Project <br />Percentage <br />Influence <br />Roadway Segment <br />Capacity <br />ADT <br />(3) = (2) _ (1) <br />(Yes/No) <br />First Street, west of <br />1. <br />56,300 <br />206 <br />0.4% <br />No <br />Elk Lane/Mabury Street <br />First Street, between <br />2. <br />56,300 <br />495 <br />0.9% <br />No <br />Elk Lane/Mabury Street and I-5 SB On -Ramp <br />First Street, between <br />3. <br />56,300 <br />515 <br />0.9% <br />No <br />I-5 SB On -Ramp and Cabrillo Park Drive <br />