Laserfiche WebLink
Task 3: Design Development (50% plans) <br />Design development will involve the schematic development of approved concept plan, which shall <br />include landscape architectural, architectural, civil engineering, structural, electrical engineering, <br />draft technical specifications and "opinion of estimated cost'. <br />➢ Deliverables shall include a 50% set ofplans, including site section studies, draft specification, <br />"Opinion of Probable Cost", <br />Task 4: Construction Documents (90% and 100%plans) <br />Construction Documents (CDs) shall include finalizing approved deliverables from the Design <br />Development phase. This includes the provision of detailed engineering and construction drawings <br />that will serve as the basis for both bidding and construction by a general contractor. <br />Deliverables shall include 90% and 100% plans, structural calculations, CASP report, final <br />technical specifications, finalized "Opinion of Probable Cost". <br />Plans: Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />o Site Erosion Plan <br />o Horizontal and Vertical Control Plan <br />o Grading and On -Site Drainage Plan <br />o Site Utility Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans and Details (including plumbing) <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />• Architectural <br />o Holding Facility Plans <br />o Holding Facility Interior elevations, Finish schedule <br />o Roof Framing Plan <br />o Reflected Ceiling Plan <br />o Exterior Elevations <br />o Interior Elevations <br />o Mechanical and Plumbing Plans/T-24 <br />o Electrical Plans, as applicable <br />o Architectural Details <br />o Structural Calculations <br />o Door/Window/Finish Schedules, as applicable <br />Structural Engineering <br />City of Santa Ana RFP 23-033 <br />Page Al-5 <br />