My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOC ARCHITECTS
Clerk
>
Contracts / Agreements
>
L
>
LOC ARCHITECTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:46:55 PM
Creation date
8/22/2023 4:52:43 PM
Metadata
Fields
Template:
Contracts
Company Name
LOC ARCHITECTS
Contract #
A-2023-136
Agency
Public Works
Council Approval Date
8/1/2023
Expiration Date
7/31/2023
Insurance Exp Date
3/28/2025
Destruction Year
2031
Notes
FOR INSURANCE SEE THE NOTICE OF COMPLIANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOC is responsible for facilitating the project's design and planning process within the constraints of <br />the Owner, governing authorities, and sub -consultants' requirements. LOC is always committed to <br />producing the ideal project for the Owner within the stated requirements and identified constraints. <br />Pre -Design <br />6 weeks <br />Preliminary design shall include Kick-off meeting with City Staff (representatives from Public Works <br />Agency, Parks, Recreation and Community Services Agency and Santa Ana Zoo) to discuss scope of <br />work, project goals and objectives, potential elements and issues, schedule, review of existing <br />information and site investigation. <br />Deliverables shall include a Work Task Plan, Schedule, Geotechnical Report and Site Survey <br />Concept Design <br />8 weeks <br />• Develop program with zoo team and provide written narrative of project scope. <br />• Based upon a detailed review of the program, test fits site constraints, and budget requirements, <br />LOC shall develop a set of schematic design documents illustrating the scale and relationship of <br />the project components. <br />• These drawings shall include a site plan, building plans, sections and elevations. <br />• Deliverables (1): One set of schematic design documents. <br />• Renderings: (3) conceptual electronic renderings. <br />• Meetings (2): 1. 50% schematic design review; 2. 100% schematic design review for approval. <br />• Allowable Revisions: Any revisions that do not revisit approved decisions documented in the test fits <br />• LOC confirms that this effort shall be completed in three weeks. <br />• Concept design shall include up to three (3) meetings with City Staff to brainstorm and review <br />potential layouts. <br />• Deliverables shall include up to three (3) schematic concept designs, with one final renderedconcept <br />site plan and perspective drawing for fundraising and presentation purposes. <br />Design Development 12 weeks <br />• Upon the Owner's approval of Schematic Design, LOC shall refine the design to include more <br />detailed information i.e. refine location of furniture, walls, doors, windows per Owner's comments. <br />Develop Site Plan, Floor Plans, Building sections, Exterior Elevations, and Schedules as necessary. <br />• Prepare and present exterior and interior material and finish samples. AssisttheOwners inselection. <br />• Assist the Owners in selecting fixtures, appliances, door and window systems, and related hardware. <br />• Typical construction details and equipment layouts shall be determined. <br />• Deliverables (1): One set of design development documents. <br />• Renderings: (3) conceptual electronic renderings updated to reflect material selection etc. <br />• Meetings (2): 1. 50%design development review; 2. 100%design development review for approval. <br />• Allowable Revisions: Any revisions that do not revisit approved decisions documented in the <br />L O C SANTA ANA ZOO Saniq �g,,� <br />Architects COMMUNITY HUB BUILIDNG "THE HIVE" RFP ^��I <br />March 23, 2023 <br />4'a <br />
The URL can be used to link to this page
Your browser does not support the video tag.