Laserfiche WebLink
BASE SCOPE INFORMATION <br />schematic design documents. <br />LOC confirms that this effort shall be completed in six weeks. <br />Deliverables shall include a 50% set of plans, including site section studies, draft specification, <br />"Opinion of Probable Cost." <br />Construction Documents 12 weeks <br />Develop thorough drawings required for City submittal and Bidding (Site Plan, Floor Plans, <br />Electrical/ Lighting Plans, Interior and Exterior Elevations, Building Sections, Details) incorporating <br />any structural or sub -consultant requirements that are intended for construction. <br />• Establish in detail the quality level of materials and system used in the project. <br />• Deliverables (2): 1. one set of permit submittal documents; 2. one set of bid documents. <br />• Renderings: N/A <br />• Meetings (2): 1. 50% construction documents review; 2. 100% construction documents review <br />for approval. <br />• Allowable Revisions: Any revisions that do not revisit approved decisions documented in the <br />design development documents. <br />• LOC confirms that this effort shall be completed in twelve weeks. <br />• Deliverables shall include 90% and 100% plans, structural calculations, CASP report, final <br />technical specifications, finalized "Opinion of Probable Cost". <br />Plan Check and Bidding (concurrent) <br />• Submit drawings for Plan Check review by the City of Los Angeles <br />• Assist in bidding process, provide additional clarification/ information/ addenda as necessary. <br />• Review and address City issued Plan Check corrections as well as any required departmental <br />clearances. <br />• Obtain Ready to Issue certificate from the City. <br />• Deliverables (2): 1. plan check corrections as necessary; 2. Ready to Issue certificate <br />• Renderings: N/A <br />• Meetings : N/A <br />• Allowable Revisions: Any revisions that do not revisit approved decisions documented in the <br />approved construction documents. <br />• The duration of the plan check process is not entirely within the control of the Architect, but LOC <br />shall make every effort to conclude it within the allotted time. <br />Construction Observation 52 weeks <br />LOC shall visit the site once a week to ensure that the project is being built in conformance with <br />the Contract Documents. <br />• LOC shall respond to RFI's and submittals in a timely fashion <br />• LOC shall review and certify the amounts due the Contractor and shall issue certificates in such <br />L O C SANTA ANA ZOO Sal" <br />Architects COMMUNITY HUB BUILIDNG "THE HIVE" RFP ��-7V <br />March 23, 2023 47 <br />