Laserfiche WebLink
amounts. <br />• Deliverable: N/A <br />• Renderings: N/A <br />• Meetings (20): Weekly on -site OAC meeting <br />• Allowable Revisions: Any revisions necessary to accommodate unforeseen site conditions. <br />• The duration of the construction process is not entirely within the control of the Architect, but LOC shall <br />make every effort to assist the contractor in meeting scheduled milestones. <br />• Plans: Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />• o Site Erosion Plan <br />• o Horizontal and Vertical Control Plan <br />• o Grading and On -Site Drainage Plan <br />• o Site Utility Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans and Details (including plumbing) <br />• o Site Sections, as applicable <br />• o Planting Plans/Details/Notes <br />• o Irrigation Plans/Details/Calculations/Notes <br />• Architectural <br />• o Holding Facility Plans <br />• o Holding Facility Interior elevations, Finish schedule <br />• o Roof Framing Plan <br />• o Reflected Ceiling Plan <br />• o Exterior Elevations <br />• o Interior Elevations <br />• o Mechanical and Plumbing Plans/T-24 <br />• o Electrical Plans, as applicable <br />• o Architectural Details <br />• o Structural Calculations <br />• o Door/Window/Finish Schedules, as applicable <br />• Structural Engineering <br />• o Structural Design and Detailing <br />• Mechanical Engineering & Plumbing <br />• Electrical Engineering <br />• o Electrical Site Plan to include walkway lighting, irrigation. <br />L 0 C SANTA ANA ZOO Sant <br />161-0 <br />Architects COMMUNITY HUB BUILIDNG "THE HIVE' RFP ^7 <br />March 23, 2023 <br />M <br />