My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5 <br />Consistency Analysis-2022 Scoping Plan Update <br />Sector <br />Actions and Strategies <br />Statutes, Executive Orders, Other Direction <br />Project Consistency Analysis <br />appliance sales are electric by <br />Building requirements during <br />2035. Appliances are replaced at <br />construction and any future retrofit or <br />end of life such that by 2030 there <br />appliance replacement requirements. <br />are 3 million all -electric and <br />electric -ready homes —and by <br />2035, 7 million homes —as well as <br />contributing to 6 million heat <br />pumps installed statewide by <br />2030. <br />80% of appliance sales are <br />No Conflict. While the Project is not <br />electric by 2030, and 100% of <br />an existing commercial development, it <br />Existing Commercial <br />appliance sales are electric by <br />AB 197: direct emissions reductions for sources <br />would not interfere with any future <br />Buildings <br />2045. Appliances are replaced at <br />covered by the AB 32 Inventory <br />requirements to retrofit commercial <br />end of life, contributing to 6 <br />appliances. <br />million heat pumps installed <br />statewide by 2030. <br />7.5% of energy demand <br />1red direct emissions reductions for sources <br />No Conflict. The Project would not <br />Food Products <br />electrified directly and/or <br />co <br />covered by the AB 32 Inventory <br />directly impact sources of energy for <br />indirectly by 2030; 75% by 2045 <br />food production. <br />25% of energy demand electrified <br />AB 197: direct emissions reductions for sources <br />No Conflict. The Project would not <br />Construction Equipment <br />by 2030 and 75% electrified by <br />covered by the AB 32 Inventory <br />directly impact sources of energy for <br />2045 <br />construction equipment. <br />Electrify 0% of boilers by 2030 <br />AB 197: direct emissions reductions for sources <br />No Conflict. The Project would not <br />Chemicals and Allied <br />and 100% of boilers by 2045. <br />covered by the AB 32 Inventory <br />directly impact the sources of energy <br />Products; Pulp and <br />Hydrogen for 25% of process <br />for boilers. <br />Paper <br />heat by 2035 and 100% by 2045 <br />Electrify 100% of other energy <br />demand by 2045. <br />CCS on 40% of operations by <br />SB 596: Reduce demand for fossil energy, process <br />No Conflict. The Project would not <br />Stone, Clay, Glass, and <br />2035 and on all facilities by 2045 <br />emissions, and GHGs, and improve air quality. <br />directly impact the sources of energy <br />Cement <br />Process emissions reduced <br />AB 197: direct emissions reductions for sources <br />for stone, clay, glass, and cement <br />through alternative materials and <br />covered by the AB 32 Inventory <br />facilities. <br />CCS <br />Cabrillo Town Center <br />Greenhouse. as ec <br />PAGE 37 <br />18 - 1002 <br />City of Santa Ana <br />10/3/2023 July 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.