My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table 4-1 <br />Impacts <br />Mitigation Monitoring Program for the Metro East Mixed Use Overlay <br />MitfgationMeasures MonitonngParry <br />Zone Component <br />Implementing <br />Parry <br />MitigationTiming <br />MM-0Z4.2-5 The developer shall require by contract specifications that <br />Planning and <br />Project <br />Prior to <br />construction equipment engines wil be maintained in good condition and in proper <br />Building Agency <br />Applicant <br />Construction <br />time per manufacturer's specification for the duration of construction. Contract <br />specifications shall be included in the proposed project construction documents, <br />which shall be approved by the City of Santa Ana Planning and Building Agency <br />staff. <br />MM-0Z4.2-6 The developer shall require by contract specifications that <br />Planning and <br />Project <br />Prior to <br />construction related equipment, including heavy-duty equipment, motor vehicles, <br />Building Agency <br />Applicant <br />Construction <br />and portable equipment, shall be turned off when not in use for more than <br />5 minutes. Contract specifications shall be included in the proposed project <br />construction documents, which shall be approved by the City of Santa Ana <br />Planning and Building Agency staff. <br />NW-0Z4.2-7 The developer shall require by contract specifications that <br />Planning and <br />Project <br />Prior to <br />construction operations rely on the electricity infrastructure surrounding the <br />Building Agency <br />Applicant <br />Construction <br />construction site rather than electrical generators powered by internal combustion <br />engines to the extent feasible. Contract specifications shall be included in the <br />proposed project construction documents, which shall be approved by the City of <br />Santa Ana Planning and Building Agency staff. <br />NM-0Z4.2-8 The developer shall require by contract specifications that <br />Planning and <br />Project <br />Prior to <br />construction parking be configured to minimize traffic interference during the <br />Building <br />Applicant <br />Construction <br />construction period and, therefore, reduce idling of traffic. Contract specifications <br />Agency/Public <br />shall be included in the proposed project construction documents, which shall be <br />Works <br />approved by the City of Santa Ana Planning and Building Agency staff. <br />NM-0Z4.2-9 The developer shall require by contract specifications that temporary <br />Planning and <br />Project <br />Prior to <br />traffic controls are provided, such as a flagperson, during all phases of <br />Building <br />Applicant <br />Construction <br />construction to maintain smooth traffic flow. Contract specifications shall be <br />Agency/Public <br />included in the proposed project construction documents, which shall be approved <br />Wcd<s <br />by the City of Santa Ana Planning and Building Agency staff. <br />MM-0Z4.2-10 The developer shall require by contract specifications that <br />Planning and <br />Project <br />Prior to <br />construction activities that affect traffic flow on the arterial system be scheduled to <br />Building <br />Applicant <br />Construction <br />off-peak hours (10.4 M to 4 P.M). Contract specifications shall be included in the <br />Agency/Public <br />proposed project construction documents, which shall be approved by the City of <br />Works <br />Santa Ana Planning and Building Agency staff. <br />Metro East Mivarl I Ica Ovprla�i 7nnp (\/nIi imp 111) 4-5 <br />City Council 18 — 404 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.