Chapter 4 Mitigation Monitoring and Reporting Program <br />Table 4-1 <br />Impacts <br />Mitigation Monitoring Program for the Metro East Mixed Use Overlay <br />MitigationMeasures MonitonngParty <br />Zone Component <br />Implementing <br />Parry <br />MitigationTiming <br />MM-0Z4.2-11 The developer shall require by contract specifications that <br />Planning and <br />Project <br />Prior to <br />dedicated on -site and off -site left -turn lanes on truck hauling routes be utilized for <br />Building <br />Applicant <br />Construction <br />movement of construction trucks and equipment on site and off site to the extent <br />Agency/Public <br />feasible during construction activities. Contract specifications shall be included in <br />Wo& <br />the proposed project construction documents, which shall be approved by the City <br />ofSanta Ana. <br />MM-OZ4.2-12 Upon issuance of building or grading permits, whichever is issued <br />Planning and <br />Project <br />Upon Issuance of <br />earliest; notification shall be mailed to owners and occupants of all developed land <br />Building Agency <br />Applicant <br />Building or Grading <br />uses within 1/4 mile of the Overlay Zone and the individual projects within the <br />Permits <br />Overlay Zone providing a schedule for major construction activities that wrll occur <br />through the duration of the construction period. In addition, the notification wi l <br />include the identification and contact number for a community liaison and <br />designated construction manager that would be available on site to monitor <br />construction activities. The construction manager shall be responsible for <br />complying with all project requirements related to PMro generation. The <br />construction manager writ be located at the on -site construction office during <br />construction hours for the duration of all construction activities. Contract <br />information for the community liaison and construction manager wrll be located at <br />the construction office, City Hall, the police department, and a sign on site. <br />MM-OZ4.2-13 As required by South Coast Air Quality Management District Rule <br />Planning and <br />Project <br />During Grading, <br />403—Fugitive Dust, all construction activities that are capable of generating <br />Building Agency <br />Applicant <br />Construction and <br />fugitive dust are required to implement dust control measures during each phase <br />Project <br />of project development to reduce the amount of particulate matter entrained in the <br />Implementation <br />ambient air. These measures include the following. <br />■ Uniting the amount ofarea disturbed during site grading to 10 acres per day <br />■ Application ofsoil stabilizers to inactive construction areas <br />■ Quickreplacement ofground cover in disturbed areas <br />■ Watering ofexposed surfaces three times daily <br />■ Watering of all unpaved haul roads three times daily <br />• Covering all stockpiles with tarp <br />■ Reduction ofvehicle speed on unpaved roads <br />■ Post signs on site, limiting traffic to 15 miles per hour or less <br />■ Sweep streets adjacent to the project site at the end of the day if visible soil <br />material is carried over to adjacent roads <br />4-6 r'04 nf Santa Ana <br />City Council 18 — 405 10/3/2023 <br />