My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table 4-1 <br />Impacts <br />Mitigation Monitoring Program for the Metro East Mixed Use Overlay <br />MitigationMeasures MonitonngParty <br />Zone Component <br />Implementing <br />Parry <br />MitigationTiming <br />MM-0Z4.2-11 The developer shall require by contract specifications that <br />Planning and <br />Project <br />Prior to <br />dedicated on -site and off -site left -turn lanes on truck hauling routes be utilized for <br />Building <br />Applicant <br />Construction <br />movement of construction trucks and equipment on site and off site to the extent <br />Agency/Public <br />feasible during construction activities. Contract specifications shall be included in <br />Wo& <br />the proposed project construction documents, which shall be approved by the City <br />ofSanta Ana. <br />MM-OZ4.2-12 Upon issuance of building or grading permits, whichever is issued <br />Planning and <br />Project <br />Upon Issuance of <br />earliest; notification shall be mailed to owners and occupants of all developed land <br />Building Agency <br />Applicant <br />Building or Grading <br />uses within 1/4 mile of the Overlay Zone and the individual projects within the <br />Permits <br />Overlay Zone providing a schedule for major construction activities that wrll occur <br />through the duration of the construction period. In addition, the notification wi l <br />include the identification and contact number for a community liaison and <br />designated construction manager that would be available on site to monitor <br />construction activities. The construction manager shall be responsible for <br />complying with all project requirements related to PMro generation. The <br />construction manager writ be located at the on -site construction office during <br />construction hours for the duration of all construction activities. Contract <br />information for the community liaison and construction manager wrll be located at <br />the construction office, City Hall, the police department, and a sign on site. <br />MM-OZ4.2-13 As required by South Coast Air Quality Management District Rule <br />Planning and <br />Project <br />During Grading, <br />403—Fugitive Dust, all construction activities that are capable of generating <br />Building Agency <br />Applicant <br />Construction and <br />fugitive dust are required to implement dust control measures during each phase <br />Project <br />of project development to reduce the amount of particulate matter entrained in the <br />Implementation <br />ambient air. These measures include the following. <br />■ Uniting the amount ofarea disturbed during site grading to 10 acres per day <br />■ Application ofsoil stabilizers to inactive construction areas <br />■ Quickreplacement ofground cover in disturbed areas <br />■ Watering ofexposed surfaces three times daily <br />■ Watering of all unpaved haul roads three times daily <br />• Covering all stockpiles with tarp <br />■ Reduction ofvehicle speed on unpaved roads <br />■ Post signs on site, limiting traffic to 15 miles per hour or less <br />■ Sweep streets adjacent to the project site at the end of the day if visible soil <br />material is carried over to adjacent roads <br />4-6 r'04 nf Santa Ana <br />City Council 18 — 405 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.