Laserfiche WebLink
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table 4-1 <br />impacts <br />Mitigation Monitoring Program for the Metro East Mixed Use Overlay <br />MitigationMeasures MonitonngParty <br />Zone Component <br />Implementing <br />Parry <br />MitigationTiming <br />■ Cover or have water applied to the exposed surface of all trucks hauling dirt, <br />sand, soil, or other loose materials prior to leaving the site to prevent dust from <br />impacting the surrounding areas <br />Install wheel washers where vehicles enter and exit unpaved roads onto paved <br />roads to wash offtrucks and any equipment leaving the site each trip <br />NW-0Z4.2-14 The developer shall require by contract specifications that the <br />Planning and <br />Project <br />Prior to <br />architectural coating (paint and primer) products used would have a VOC rating of <br />Building Agency <br />Applicant <br />Construction <br />100 grams per liter or less. Contract specifications shall be included in the <br />proposed project construction documents, which shall be reviewed and approved <br />by the City of Santa Ana Planning and Building Agency staff. <br />NM-0Z4.2-15 The developer shall require by contract specifications that materials <br />Planning and <br />Project <br />Prior to <br />that do not require painting be used during construction to the extent feasible. <br />Building Agency <br />Applicant <br />Construction <br />Contract specifications shall be included in the proposed project construction <br />documents, which shall be reviewed and approved by the City of Santa Ana <br />Planning and Building Agency staff. <br />MM-0Z4.2-16 The developer shall require by contract specifications that pre- <br />Planning and <br />Project <br />Prior to <br />painted construction materials be used to the extent feasible. Contract <br />Building Agency <br />Applicant <br />Construction <br />specifications shall be included in the proposed project construction documents, <br />which shall be reviewed and approved by the City of Santa Ana Planning and <br />Building Agency staff. <br />Biological Resources <br />Impact 4.3-1: Implementation of <br />NW-0Z4.3-1 To ensure that avian species of concern, protected migratory <br />Planning and <br />Project <br />Prior to and during <br />the proposed project would not <br />species (e.g., NWA� or raptors species are not injured or disturbed by <br />Building <br />Applicant <br />Construction <br />result in a potential reduction in <br />construction in the vicinity of nesting habitat, the project applicant shall implement <br />Agency/CDFG <br />nesting opportunities for resident <br />the following measures: <br />and migratory avian species of <br />1. When feasible, all tree removal shall occur between August 30 and <br />special concern. <br />February 15 to avoid the breeding season of any raptor species that could <br />be using the area, and to discourage hawks from nesting in the vicinity of <br />an upcoming construction area. This period may be modified with the <br />authorization of the DFQ or if it is not feasible to remove trees outside this <br />window then, prior to the beginning of mass grading, including grading for <br />major infrastructure improvements, during the period between February 15 <br />and August 30, all trees within 350 feet of any wading or earthmoving <br />Metro East Mivarl I Ica Ovprla�i 7nnp (\/nIi imp 111) 4-7 <br />City Council 18 — 406 10/3/2023 <br />