Chapter 4 Mitigation Monitoring and Reporting Program <br />Table 4-1 <br />Impacts <br />Mitigation Monitoring Program for the Metro East Mixed Use Overlay <br />MitigationMeasures MonitoringParry <br />Zone Component <br />Implementing <br />Parry <br />MitigationTiming <br />Impact 4.6-3: Construction <br />MM-0Z4.6-2 Prior to the issuance of grading permits on any project site, the site <br />Planning and <br />Project <br />Prior to Issuance of <br />activities associated with <br />developer(s) shall: <br />Building Agency <br />Applicant <br />Grading Permits <br />implementation of the proposed <br />■ Investigate the project site to determine whether it or immediately adjacent <br />Overlay Zone could result in the <br />areas have a record of hazardous material contamination via the preparation of <br />release of hazardous materials to <br />a preliminary environmental site assessment (ESA), which shall be submitted to <br />the environment through <br />the City for review. If contamination is found the report shall characterize the <br />reasonably foreseeable upset and <br />site according to the nature and extent of contamination that is present before <br />accident conditions. <br />development activities precede at that site. <br />■ If contamination is determined to be on site, the City, in accordance with <br />appropriate regulatory agencies, shall determine the need for further <br />investigation and/or remediation of the soils conditions on the contaminated <br />site. If firrther investigation or remediation is required, it shall be the <br />responsibility of the site developer(s) to complete such investigation and/or <br />remediation prior to construction ofthe project. <br />■ Ifremediation is required as identified by the local oversight agency, it shall be <br />accomplished in a manner that reduces risk to below applicable standards and <br />shall be completed prior to issuance ofany occupancypern its. <br />MM-OZ4.6-3 In the event that previously unknown or unidentified soil and/or <br />Planning and <br />Project <br />During construction <br />groundwater contamination that could present a threat to human health or the <br />Building Agency <br />Applicant <br />environment is encountered during construction of the proposed project, <br />construction activities in the immediate vicinity of the contamination shall cease <br />immediately. If contamination is encountered, a Risk Management Plan shall be <br />prepared and implemented that (1) identifies the contaminants of concern and the <br />potential risk each contaminant would pose to human health and the environment <br />during construction and post -development and (2) describes measures to be taken <br />to protect workers, and the public from exposure to potential site hazards. Such <br />measures could include a range of options, including, but not limited to, physical <br />site controls during construction, remediation, long-term monitoring, post - <br />development maintenance or access limitations, or some combination thereof. <br />Depending on the nature of contamination, if any, appropriate agencies shall be <br />notified (e.g., City of Santa Ana Fire Department). If needed, a Site Health and <br />Safety Plan that meets Occupational Safety and Health Administration <br />requirements shall be prepared and in place prior to commencement of work in <br />any contaminated area. <br />Metro East Mivarl I Ica Ovprla�i 7nnp (\/nIi imp 111) 4-11 <br />City Council 18 — 410 10/3/2023 <br />