My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table 4-1 <br />Mitigation Monitoring Program for the Metro East Mixed Use Overlay <br />Zone Component <br />Implementing <br />Impacts <br />MitigationMeasures MonitonngParty <br />Parry <br />MitigationTiming <br />trip generation rates which are specific for these projects and are approved by <br />the City. The traffic consultant preparing traffic studies for specific projects in <br />the Overlay Zone must use City -approved hip generation rates specific to these <br />projects. These studies are subject to Cityreview. <br />Utilities and Service Systems <br />Impact 4.13-4: Implementation of <br />NW-0Z4.13-1 The developer is required to undertake a site -specific sewer <br />Public <br />Project <br />During Design and <br />the Metro East Mixed Use Overlay <br />evaluation, including flowmonitoring and modeling, maybe required as part of the <br />Works/orange <br />Applicant <br />Prior to <br />Zone could require the <br />project design to detennine the adequacy ofthe existing sewer pipe capacity in the <br />County Sanitation <br />Implementation of <br />construction of new or expanded <br />affected project area lines. <br />District <br />the proposed <br />wastewater conveyance systems, <br />project <br />the construction of which would <br />not cause significant <br />environmental effects. <br />Impact 4.13-8: Implementation of <br />NW-0Z4.13-2 The project shall implement energy conservation measures (such <br />Planning and <br />Project <br />Prior to Issuance of <br />the Overlay Zone could increase <br />as energy -efficient lighting and micro processor controlled HVAC equipment) to <br />Building Agency <br />Applicant <br />Building Permits <br />the demand for electricity and gas, <br />reduce the demand for electricity and natural gas. The energy conservation <br />but would not require or result in <br />measures shall be subject to modification as new technologies are developed or if <br />the construction of new energy <br />current technologybecomes obsolete through replacement. <br />production or transmission <br />facilities, the construction of which <br />could cause a significant <br />environmental impact. <br />Metro East Mivarl I Ica Ovprla�i 7nnp (\/nIi imp 111) 4-19 <br />City Council 18 — 418 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.