Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />MonitonngParry <br />Project <br />ImplementingParty <br />MitigationTiming <br />number ofpeople. <br />waste. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Impact 4.2-6: Construction <br />Applicable Overlay Zone Mitigation Measures: <br />activities associated with the <br />MM-0Z4.2-2 The developer shall require by contract specifications that all diesel- <br />Planning and <br />Project Applicant <br />Prior to <br />proposed project would exceed <br />powered equipment used would be retrofitted with after -treatment products (e.g., <br />Building Agency <br />Construction <br />South Coast Air Quality <br />engine catalysts and other technologies available at the time construction <br />Management District Standards <br />commences) when construction activities commence. Contract specifications shall <br />for VOC and NON and would <br />be included in the proposed project construction documents, which shall be <br />result in a projected air quality <br />approved by the City of Santa Ana Planning and Building Agency staff. <br />violation. This is considered a <br />potentially significant impact. <br />MM-0Z4.2-3 The developer shall require by contract specifications that all heavy- <br />Planning and <br />Project Applicant <br />Prior to <br />duty diesel -powered equipment operating and refueling at the project site would <br />Building Agency <br />Construction <br />use low NOXdiesel fuel to the extent that it is readily available and cost effective <br />(up to 125 percent of the cost of Califomia Air Resources Board diesel) in the <br />South Coast Air Basin at the time construction activities commence. This <br />requirement shall not apply to diesel -powered trucks traveling to and from the <br />project site. Contract specifications shall be included in the proposed project <br />construction documents, which shall be approved by the City of Santa Ana <br />Planning and Building Agency staff. <br />MM-0Z4.2-4 The developer shall require by contract specifications that alternative <br />Planning and <br />Project Applicant <br />Prior to <br />fuel construction equipment (i.e., compressed natural gas, liquid petroleum gas, <br />Building Agency <br />Construction <br />and unleaded gasoline) would be utilized to the extent feasible in the South Coast <br />Air Basin at the time construction activities commence. Contract specifications <br />shall be included in the proposed project construction documents, which shall be <br />approved by the City of Santa Ana Planning and Building Agency staff. <br />MM-0Z4.2-5 The developer shall require by contract specifications that <br />Planning and <br />Project Applicant <br />Prior to <br />construction equipment engines wil be maintained in good condition and in proper <br />Building Agency <br />Construction <br />tune per manufacturer's specification for the duration of construction. Contract <br />specifications shall be included in the proposed project construction documents, <br />which shall be approved by the City of Santa Ana Planning and Building Agency <br />staff <br />MM-0Z4.2-6 The developer shall require by contract specifications that <br />Planning and <br />Project Applicant <br />Prior to <br />construction -related equipment, including heavy-duty equipment, motor vehicles, <br />Building Agency <br />Construction <br />and portable equipment, shall be turned off when not in use for more than five <br />Metro East Mivarl I Ica Ovprla�i 7nnp (\/nIi imp 111) 4-21 <br />City Council 18 — 420 10/3/2023 <br />