My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />I MonitonngParry <br />Project <br />ImplementingParty <br />MitigationTiming <br />minutes. Contract specifications shall be included in the proposed project <br />construction documents, which shall be approved by the City of Santa Ana <br />Planning and Building Agency staff. <br />MM-0Z4.2-7 The developer shall require by contract specifications that <br />Planning and <br />Project Applicant <br />Prior to <br />construction operations rely on the electricity infrastructure surrounding the <br />Building Agency <br />Construction <br />construction site rather than electrical generators powered by internal combustion <br />engines to the extent feasible. Contract specifications shall be included in the <br />proposed project construction documents, which shall be approved by the City of <br />Santa Ana Planning and Building Agency staff. <br />MM-0Z4.2-8 The developer shall require by contract specifications that <br />Planning and <br />Project Applicant <br />Prior to <br />construction parking be configured to minimise traffic interference during the <br />Building <br />Construction <br />construction period and, therefore, reduce idling of traffic. Contract specifications <br />Agency/Public <br />shall be included in the proposed project construction documents, which shall be <br />Works <br />approved by the City of Santa Ana Planning and Building Agency staff. <br />MM-0Z4.2-9 The developer shall require by contract specifications that temporary <br />Planning and <br />Project Applicant <br />Prior to <br />traffic controls are provided, such as a flag person, during all phases of <br />Building <br />Construction <br />construction to maintain smooth traffic flow. Contract specifications shall be <br />Agency/Public <br />included in the proposed project construction documents, which shall be approved <br />Works <br />by the City of Santa Ana Planning and Building Agency staff. <br />MM-0Z4.2-10 The developer shall require by contract specifications that <br />Planning and <br />Project Applicant <br />Prior to <br />construction activities that affect traffic flow on the arterial system be scheduled to <br />Building <br />Construction <br />off-peak hours (10 AM to 4 P.M.). Contract specifications shall be included in the <br />Agency/Public <br />proposed project construction documents, which shall be approved by the City of <br />Works <br />Santa Ana Planning and Building Agency staff. <br />MM-0Z4.2-11 The developer shall require by contract specifications that <br />Planning and <br />Project Applicant <br />Prior to <br />dedicated on -site and off -site left -turn lanes on truck hauling routes be utilized for <br />Building <br />Construction <br />movement ofconstruction trucks and equipment on site and offsite to the extent <br />Agency/Public <br />feasible during construction activities. Contract specifications shall be included in <br />Works <br />the proposed project construction documents, which shall be approved by the City <br />of Santa Ana Planning and Building Agency staff. <br />MM-0Z4.2-12 Upon issuance of building or grading permits, whichever is issued <br />Planning and <br />Project Applicant <br />Upon Issuance of <br />earliest; notification shall be mailed to owners and occupants of all developed land <br />Building Agency <br />Building or Grading <br />uses within '/a mile of the Overlay Zone and the individual projects within the <br />Permits <br />Overlay Zone providing a schedule for major construction activities that w1 occur <br />through the duration of the construction period. In addition, the notification will <br />4-22 r'04 nf Santa Ana <br />City Council 18 — 421 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.