Laserfiche WebLink
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />I MonitoringParty <br />Project <br />ImplementingParty <br />MitigationTiming <br />NW-0Z4.2-15 The developer shall require by contract specifications that materials <br />Planning and <br />Project Applicant <br />Prior to <br />that do not require painting be used during construction to the extent feasible. <br />Building Agency <br />Construction <br />Contract specifications shall be included in the proposed project construction <br />documents, which shall be reviewed and approved by the City of Santa Ana <br />Planning and Building Agency staff. <br />MM-0Z4.2-16 The developer shall require by contract specifications that pre- <br />Planning and <br />Project Applicant <br />Prior to <br />painted construction materials be used to the extent feasible. Contract <br />Building Agency <br />Construction <br />specifications shall be included in the proposed project construction documents, <br />which shall be reviewed and approved by the City of Santa Ana Planning and <br />Building Agency staff. <br />Project -Specific Mitigation Measures: <br />No additional feasible mitigation is available. <br />Biological Resources <br />Impact 4.3-1: Implementation of <br />Applicable Overlay Zone Mitigation Measures: <br />the proposed project would not <br />NW-0Z4.3-1 To ensure that avian species of concern, protected migratory <br />Planning and <br />Project Applicant <br />Prior to and during <br />result in a potential reduction in <br />species (e.g., MBTA� or raptors species are not injured or disturbed by <br />Budding Agency/ <br />Project <br />nesting opportunities for resident <br />construction in the vicinity of nesting habitat, the project applicant shall implement <br />CDFG <br />Construction <br />and migratory avian species of <br />the following measures: <br />special concern. <br />1. When feasible, all tree removal shall occur between August 30 and February <br />15 to avoid the breeding season ofanyraptor species that could be using the <br />area, and to discourage hawks fromnesting in the vicinityofan upcoming <br />construction area. This period maybe modified with the authorization ofthe <br />DFQ or ifit is not feasible to remove trees outside this windowthen, prior to <br />the beginning ofmass grading, including grading for major infrastructure <br />improvements, during the period between February 15 and August 30, all trees <br />widen 350 feet ofany grading or earthmoving activity shall be surveyed for <br />active raptor nests bya qualified biologist no more than 30 days prior to <br />disturbance. Ifactive raptor nests are found, and the site is within 350 feet of <br />potentialconstruction activity, a fence shall be erected around the tree(s) at a <br />distance ofup to 350 feet, depending on the species, fromthe edge ofthe <br />canopy to prevent construction disturbance and intrusions on the nest area. <br />The appropriate buffer shall be determined by the City in consultation with <br />CDFG. <br />2. No construction vehicles shall be permitted widen restricted areas (i.e., raptor <br />4-24 r'04 nf Santa Ana <br />City Council 18 — 423 10/3/2023 <br />