My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />MonitonngParry <br />Project <br />ImplementingParty <br />MitigationTiming <br />protection zones), unless directlyrelated to the management or protection of <br />the legallyprotected species. <br />3. In the event that a nest is abandoned, despite efforts to minimize disturbance, <br />and ifthe nestlings are still alive, the developer shall contact CDFG and, <br />subj ect to CDFG approval, fund the recovery and hacking (controlled release <br />ofcaptive reared young) ofthe nestling(s). <br />4. Ifa legally protected species nest is located in a tree designated for removal, <br />the removal shall be deferred until after August 30th, or until the adults and <br />young ofthe year are no longer dependent on the nest site as determined bya <br />qualified biologist. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Cultural Resources <br />Impact 4.4-1: Implementation of <br />Applicable Overlay Zone Mitigation Measures: <br />the proposed project has the <br />NW-0Z4.4-2 Due to the lack ofculturalresource studies for the project site and in <br />Planning and <br />Project Applicant <br />During <br />potential to cause a substantial <br />order to avoid damaging any unidentified cultural resources, a qualified <br />Building Agency <br />Construction <br />adverse change in the significance <br />archaeologist should be retained to monitor any significant ground -disturbing <br />of an archaeological resource <br />activities in undeveloped areas within the Overlay Zone, and any deep (10' or <br />pursuant to Section 15064.5 ofthe <br />deeper) ground -disturbing activities in all areas ofthe OverlayZone. <br />CEQAGuidelines. <br />MM-0Z4.4-3 In the event that archeological resources are unearthed during <br />Planning and <br />Project Applicant <br />During <br />project subsurface activities, all earth -disturbing work within a 100-meter radius <br />Building Agency <br />Construction <br />must be temporarily suspended or redirected until an archeologist has evaluated <br />the nature and significance of the find After the find has been appropriately <br />mitigated, work in the area may resume. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Impact 4.4-2: Implementation of <br />Applicable Overlay Zone Mitigation Measures: <br />the proposed project has the <br />NW-0Z4.4-4 In the event that paleontological resources are unearthed during <br />Planning and <br />Project Applicant <br />During <br />Potential to directly or indirectly <br />subsurface construction activities, all earth -disturbing work within a 100-meter <br />Building Agency <br />Construction <br />destroy a unique paleontological <br />radius of the find must be temporarily suspended or redirected until a <br />resource or site, or unique <br />paleontologist has evaluated the nature and significance of the find. After the find <br />geologic feature. <br />has been appropriatelymitigated, workin the area mayresume. <br />Metro East Mivarl I Ica Ovprla�i 7nna (\/nIi imp 111) 4-25 <br />City Council 18 — 424 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.