Laserfiche WebLink
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />I MonitonngParty <br />Project <br />ImplementingParty <br />MitigationTiming <br />standards established by the City <br />. AD construction activity within the City shall be conducted in accordance with <br />of Santa Ana. Noise Regulations. <br />Section 18-314(e) ofthe City ofSanta Ana Municipal Code. <br />MM-0Z4.9-2 The project applicant shall require by contract specifications that the <br />Planning and <br />Project Applicant <br />Prior to Issuance of <br />following construction best management practices (BMPs) be implemented by <br />Building Agency <br />Grading Permit <br />contractors to reduce construction noise levels: <br />■ Two weeks prior to the commencement of construction, notification must be <br />provided to surrounding land uses within 1,000 feet of a project site disclosing <br />the construction schedule, including the various types of activities that would <br />be occurring throughout the duration ofthe construction period. <br />■ Ensure that construction equipment is properly muffied according to industry <br />standards and be in good woddng condition. <br />■ Place noise -generating construction equipment and locate construction staging <br />areas away from sensitive uses, where feasible. <br />■ Schedule high noise -producing activities between the hours of 8:00 AM and <br />5:00 P.M to minimize disruption on sensitive uses. <br />■ Implement noise attenuation measures to the extent feasible, which may <br />include, but are not limited to, temporary noise barriers or noise blankets <br />around stationaryconstruction noise sources. <br />■ Use electric air compressors and similar power tools rather than diesel <br />equipment, where feasible. <br />■ Constructionrelatedequipment, including heavy-duty equipment, motor <br />vehicles, and portable equipment, shall be turned offwhen not in use for more <br />than 30 minutes. <br />■ Construction hours, allowable workdays, and the phone number of the job <br />superintendent shall be clearly posted at all construction entrances to allow for <br />surrounding owners and residents to contact the job superintendent. Ifthe City <br />or the job superintendent receives a complaint, the superintendent shall <br />investigate, take appropriate corrective action, and report the action taken to <br />the reporting party. <br />■ Contract specifications shall be included in the proposed project construction <br />documents, which shall be reviewed by the City prior to issuance of a grading <br />permit <br />MM-0Z4.9-3 The project applicant shall require by contract specifications that <br />Planning and <br />Project Applicant <br />Prior to Issuance of <br />construction staging areas along with the operation of earthmoving equipment <br />Building Agency <br />Grading Permit <br />widen the project area would be located as far away from vibration and noise <br />4-30 r'04 nf Santa Ana <br />City Council 18 — 429 10/3/2023 <br />