Laserfiche WebLink
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />MonitoringParry <br />Project <br />ImplementingParry <br />MitigationTiming <br />quality. <br />Environmental Engineer, shall be submitted to the Department of Public Works for <br />review and approval. <br />(a) ASWPPP shall be prepared and updated as needed during the course of <br />construction to satisfy the requirements of each phase ofthe development. <br />The plan shall incorporate all necessary Best Management Practices (BMPs) <br />and other City requirements to eliminate polluted mnoffuntil all construction <br />workfor the project is completed. The SWPPP shall include treatment and <br />disposal ofall dewatering operation flows, and for nuisance flows during <br />construction. <br />(b) AWQMP shall be prepared, maintained, and updated as needed to satisfy the <br />requirements ofthe adopted NPDES program. The plan shall incorporate <br />water quality measures for all improved phases ofthe project. <br />(c) Location ofthe BMPs shall not be within the public right-of-way. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Impact 4.7-4: Development of the <br />Applicable Overlay Zone Mitigation Measures from: <br />proposed project could alter the <br />MM-0Z4.7-2 Prior to issuance of grading permits, the project applicant shall <br />Public Woks <br />Project Applicant <br />Prior to Issuance of <br />existing drainage pattern and <br />submit a Hydrology and Hydraulic Study to the Public Works Department for <br />Grading Permits <br />potentially result in increased <br />review and approval. If existing facilities are not adequate to handle runoff that <br />downstream flooding through the <br />may be generated by the proposed development, then the applicant shall propose <br />addition of impervious surfaces, or <br />feasible remedies to assure that adequate drainage facilities will be available prior <br />exceeding the capacity of existing <br />to issuance of occupancy permits. The applicant may propose stone drain <br />or planned stormwater drainage <br />improvements to be constructed in order to meet project needs. Ifnecessary storm <br />systems. <br />drain upgrades cannot be implemented prior to issuance ofoccupancy permits, on <br />site detention facilities or other methods acceptable to the City shall be included <br />with new development projects to ensure that post -construction runoff does not <br />exceed pre -development quantities. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Noise <br />Impact 4.9-1 Construction <br />Applicable Overlay Zone Mitigation Measures: <br />activities associated with the <br />NW-0Z4.9-1 Construction activities shall be limited to the following general <br />Planning and <br />Project Applicant <br />During <br />proposed project would generate <br />restrictions: <br />Building Agency <br />Construction <br />noise tevets mat exceed ute noise <br />Metro East Mivarl I Ica Ovprla�i 7nna (\/nIi imp 111) 4-29 <br />City Council 18 — 428 10/3/2023 <br />