My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />MonitoringParty <br />Project <br />ImplementingParty <br />MitigationTiming <br />■ Days of Operation —The City should work with OCTAto consider changes to <br />route times to serve nighttime and weekend project visitors and employees. <br />Headway —The City should work with OCTA to review route headways to <br />determine if it would be appropriate to reduce them to accommodate transit riders <br />within the Overlay Zone. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required <br />Utilities and Service Systems <br />Impact 4.13 4: Implementation of <br />Applicable Overlay Zone Mitigation Measures: <br />the Metro East Mixed use Overlay <br />lb mitigation is required <br />Public Works <br />Project Applicant <br />Prior to issuance of <br />Zone could require the <br />Building pests <br />construction of new or expanded <br />wastewater conveyance systems, <br />Project -Specific Mitigation Measures: <br />the construction of which would <br />MM4.13-4 A6-inch building lateral shall be installed on -site for the purposes of <br />not cause significant <br />conveying wastewater flows fromthe proposed project to the existing OCSD <br />environmental effects. <br />conveyance system. <br />Impact 4.13-8: Implementation of <br />Applicable Overlay Zone Mitigation Measures: <br />the First and Cabrillo Tower could <br />MM-0Z4.13-2 The project shall implement energy conservation measures (such <br />Planning and <br />Project Applicant <br />Prior to Issuance of <br />increase the demand for <br />as energy -efficient lighting and micro processor controlled HVAC equipment) to <br />Budding Agency <br />Building Permits <br />electricity, but would not require or <br />reduce the demand for electricity and natural gas. The energy conservation <br />result in the construction of new <br />measures shall be subject to modification as new technologies are developed or if <br />energy production or transmission <br />current technology becomes obsolete through replacement. <br />facilities, the construction of which <br />could cause a significant <br />environmental impact. <br />project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Metro East Mivarl I Ica Ovprla�i 7nna (\/nIi imp 111) 4-35 <br />City Council 18 — 434 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.