Laserfiche WebLink
to tribal resources were known and understood at the time the Certified EIR was certified. Despite <br />being omitted from the Certified EIR, an analysis of the Project's impacts on tribal resources is <br />included in this document. Per Public Resources Code 21080.3.1, AB 52 tribal consultation is <br />only required prior to the release of a negative declaration, mitigated negative declaration, or <br />environmental impact report. Because the Project relies on the Certified EIR, no negative <br />declaration, mitigated negative declaration, or environmental impact report will be released. <br />Therefore, AB 52 tribal consultation is not required for the Project. <br />3.2.19 Utilities and Service Systems <br />These checklist questions were revised to reduce redundancy. Specifically, Checklist Question <br />XVlll.a was eliminated, as wastewater treatment was already addressed in former Checklist <br />Question XVlll.e (now Checklist Question XVlll.c). In addition, former Checklist Questions XVlll.b <br />and XVlll.c were combined to address all infrastructure types in one question (now Checklist <br />Question XVlll.a) and to include the addition of telecommunications. Former Checklist Question <br />XVI Il.d regarding water supply was also updated to clarify that the analysis of water supply should <br />include reasonably foreseeable future development during normal, dry and multiple dry years. <br />Former Checklist Questions XVlll.f and XVlll.g regarding solid waste impacts were also clarified. <br />With the exception of telecommunications, all of the topics addressed in these questions were <br />addressed in Section 4.13, Utilities and Service Systems, of the Draft EIR portion of the Certified <br />EIR. <br />3.2.20 Wildfire <br />New Checklist Question XX. Wildfire pertains to projects that are located in, or near, state <br />responsibility areas or lands classified as very high fire hazard severity zones. The Project Site is <br />not located in or near state responsibility areas, nor is the Project Site located in a City -designated <br />Very High Fire Hazard Severity Zone. Therefore, these questions are not applicable to the Project. <br />However, this topic was addressed in Section 4.6, Hazards and Hazardous Materials, of the Draft <br />EIR portion of the Certified EIR. <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 485 10/3/2023 <br />