Laserfiche WebLink
applicable of CDMG Special Publication 117 where applicable and shall <br />include, but not necessarily be limited to <br />• Determination of the locations of any suspected fault traces and <br />anticipated ground acceleration at the building site <br />• Potential for displacement caused by seismically induced shaking, <br />liquefaction, differential soil settlement, expansive and compressible <br />soils, or other earth movements or soil constraints <br />• Evaluation of depth to groundwater <br />MM-OZ 4.5-2 Developers within the Overlay Zone shall conduct expansion index tests in <br />accordance with UBC Standard 18-2 prior to project construction. The design <br />of structural elements of future projects shall include recommendations set <br />forth by the expansion index tests. <br />MM-OZ 4.4-4 In the event that paleontological resources are unearthed during subsurface <br />construction activities, all earth -disturbing work within a 100-meter radius of <br />the find must be temporarily suspended or redirected until a paleontologist has <br />evaluated the nature and significance of the find. After the find has been <br />appropriately mitigated, work in the area may resume. <br />4.7.2 Does the Project propose changes that would result in new significant impacts or <br />substantial increase in the severity of significant impacts that will require major revisions <br />of the Certified EIR? <br />The Project includes the demolition and removal of all existing improvements from the Project <br />Site and development of the site with a mixed -use development including up to 507 residential <br />dwelling units, approximately 26,800 square feet of commercial uses, and associated parking, <br />utility infrastructure, landscaping, and open space, all of which is allowed under the Overlay Zone, <br />and is consistent with the Overlay Zone standards. The Project does not include any development <br />that would extend beyond the building envelope considered in the Certified EIR, and no changes <br />are proposed to the Overlay Zone to accommodate the Project. As discussed below, the Project <br />would incorporate mitigation measures to minimize impacts related to geology and soils would be <br />less than significant, and accordingly, would not result in any new or increased significant impacts <br />beyond those already identified in the Certified EIR. <br />Alquist-Priolo Earthquake Fault Zone <br />The Certified EIR concluded that there are no Alquist-Priolo Zones within the Overlay Zone that <br />would cause a fault rupture. The Overlay Zone is also not located within any currently mapped <br />Seismic Hazard Zone, where a site -specific investigation to determine the location of any faults <br />would be required. The Project Site is still not located in either an Alquist-Priolo or a Seismic <br />Hazard Zone. Thus, the Project would not result in any new or increased significant impacts <br />related to being located in such a Zone beyond impacts already identified in the Certified EIR. <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 537 10/3/2023 <br />