My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Overlay Zone shall prepare Storm Drain Plans, Stormwater Pollution <br />Prevention Plans (SWPPP), and Water Quality Management Plans (WQMP) <br />conforming to the current National Pollution System (NPDES) requirements, <br />prepared by a Licensed Civil Engineer or Environmental Engineer, shall be <br />submitted to the Department of Public Works for review and approval. <br />• A SWPPP shall be prepared and updated as needed during the course <br />of construction to satisfy the requirements of each phase of the <br />development. The plan shall incorporate all necessary Best <br />Management Practices (BMPs) and other City requirements to <br />eliminate polluted runoff until all construction work for the project is <br />completed. The SWPPP shall include treatment and disposal of all <br />dewatering operation flows, and for nuisance flows during construction. <br />• A WQMP shall be prepared, maintained, and updated as needed to <br />satisfy the requirements of the adopted NPDES program. The plan <br />shall incorporate water quality measures for all improved phases of the <br />project. <br />• Location of the BMPs shall not be within the public right-of-way. <br />MM-OZ 4.7-2 Prior to issuance of grading permits, future development projects in the Overlay <br />Zone shall submit a Hydrology and Hydraulic Study to the Public Works <br />Department for review and approval. If existing facilities are not adequate to <br />handle runoff that may be generated by the proposed development, then the <br />applicant shall propose feasible remedies to assure that adequate be available <br />prior to issuance of occupancy permits. The applicant may propose storm drain <br />improvements to be constructed in order to meet project needs. If necessary, <br />storm drain upgrades cannot be implemented prior to issuance of occupancy <br />permits, on site detention facilities or other methods acceptable to the City shall <br />be included with new development projects to ensure that post -construction <br />runoff does not exceed pre -development quantities. <br />4.10.2 Does the Project propose changes that would result in new significant impacts or <br />substantial increase in the severity of significant impacts that will require major revisions <br />of the Certified EIR? <br />The Project includes the demolition and removal of all existing improvements from the Project <br />Site and development of the site with a mixed -use development including up to 507 residential <br />dwelling units, approximately 26,800 square feet of commercial uses, and associated parking, <br />utility infrastructure, landscaping, and open space, all of which is allowed under the Overlay Zone, <br />and is consistent with the Overlay Zone standards. The Project does not include any development <br />that would extend beyond the building envelope considered in the Certified EIR, and no changes <br />are proposed to the Overlay Zone to accommodate the Project. As discussed below, the Project <br />would incorporate mitigation measures to minimize impacts related to hydrology and water quality <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 586 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.