My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.12 Mineral Resources <br />Any Substantial <br />Any Substantially <br />Changes <br />Changed <br />Involving New <br />Circumstances <br />Significant <br />Involving New <br />Impacts or <br />Significant Impact <br />Any New <br />Project <br />Impact <br />Substantially <br />or Substantially <br />Information of <br />Incorporates <br />Issues (and <br />supporting Information <br />Determination <br />More Severe <br />More Severe <br />Substantial <br />Mitigation <br />Sources) <br />in EIR <br />Impacts? <br />Impacts? <br />Importance? <br />Measure(s)? <br />MINERAL RESOURCES: Would the <br />project: <br />(a) <br />Result in the loss of <br />availability of a known <br />mineral resource that would <br />be of value to the region <br />No Impact <br />No <br />No <br />No <br />No <br />and the residents of the <br />state? <br />(b) <br />Result in the loss of <br />availability of a locally - <br />important mineral resource <br />No Impact <br />No <br />No <br />No <br />No <br />recovery site delineated on <br />local general plan, specific <br />plan or other land use plan? <br />4.12.1 Impact Determination in the EIR <br />The Certified EIR stated that the Overlay Zone would not result in any impacts related to mineral <br />resources. <br />Mitigation Measures <br />None required. <br />4.12.2 Does the Project propose changes that would result in new significant impacts or <br />substantial increase in the severity of significant impacts that will require major revisions <br />of the Certified EIR? <br />The Project includes the demolition and removal of all existing improvements from the Project <br />Site and development of the site with a mixed -use development including up to 507 residential <br />dwelling units, approximately 26,800 square feet of commercial uses, and associated parking, <br />utility infrastructure, landscaping, and open space, all of which is allowed under the Overlay Zone, <br />and is consistent with the Overlay Zone standards. The Project does not include any development <br />that would extend beyond the building envelope considered in the Certified EIR, and no changes <br />are proposed to the Overlay Zone to accommodate the Project. Thus, the Project would not result <br />in any new or increased significant impacts related to mineral resources beyond those already <br />identified in the Certified EIR. <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 595 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.