Laserfiche WebLink
accommodate the projected growth increases. Additionally, due to the fact that the City's <br />population is forecasted to grow at a slower rate than the County and SCAG Region, the <br />forecasted project -related direct and indirect population growth in the City is not considered <br />substantial relative to the surrounding areas. As such, this impact was determined to be less than <br />significant. <br />Displace Housing or People <br />The Certified EIR stated the Overlay Zone is developed with commercial and office uses. Because <br />no residential uses are located within the overlay zone boundaries, implementation of the Overlay <br />Zone would not require the demolition of any existing housing and construction of replacement <br />housing would not be necessary. Rather, implementation of the Overlay Zone would permit <br />residential uses in an area that prohibits these uses. Consequently, no impact would occur. <br />Mitigation Measures <br />None required or identified. <br />4.14.2 Does the Project propose changes that would result in new significant impacts or <br />substantial increase in the severity of significant impacts that will require major revisions <br />of the Certified EIR? <br />The Project includes the demolition and removal of all existing improvements from the Project <br />Site and development of the site with a mixed -use development including up to 507 residential <br />dwelling units, approximately 26,800 square feet of commercial uses, and associated parking, <br />utility infrastructure, landscaping, and open space, all of which is allowed under the Overlay Zone, <br />and is consistent with the Overlay Zone standards. The Project does not include any development <br />that would extend beyond the building envelope considered in the Certified EIR, and no changes <br />are proposed to the Overlay Zone to accommodate the Project. Therefore, the Project's housing <br />and population generation would be consistent with that identified in the Certified EIR. Thus, the <br />Project would not result in any new or increased significant impacts related to unplanned growth <br />beyond impacts already identified in the Certified EIR. <br />There is no housing on the Project Site. As such, the Project would not displace substantial <br />numbers of existing housing, necessitating the construction of replacement housing elsewhere, <br />and no impacts related to this issue would occur. <br />4.14.3 Any substantial changes in circumstances involving new significant impacts or <br />substantial increase in the severity of significant impacts that will require major revisions <br />of the Certified EIR? <br />No substantial changes in the circumstances related to population and housing have occurred <br />within the vicinity of the Project since the certification of the Certified EIR that would result in new <br />or more severe significant environmental impacts. <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 608 10/3/2023 <br />