My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
implementation of the improvement measures for these intersections cannot be ensured by the <br />City, particularly because one of the intersections (Irvine Boulevard at SR-55 Northbound Ramps) <br />is located outside of the City's jurisdiction. Therefore, this impact was determined to be considered <br />significant and unavoidable, and the City adopted a statement of overriding considerations. <br />Mitigation Measures <br />MM-OZ 4.12-1 As part of the project, the City of Santa Ana and the project sponsors shall work <br />with the transit providers to implement various transit -related measures to <br />improve and expand bus system service within the Overlay Zone. These <br />measures may include, but are not limited to, the following: <br />• Adding bus stops to the Overlay Zone along existing and proposed <br />roadways <br />• Changing bus service headways to respond to increased demand <br />• Changing bus service destinations to respond to changing demand <br />• Adding local shuttle service for employees and patrons of the Overlay <br />Zone <br />The details of bus service improvements shall be determined in coordination <br />with OCTA. The following recommendations would help encourage public <br />transit patronage for project -related trips: <br />• Bus Stop Locations —Relocation of existing bus stops and the provision <br />of additional bus stops should be considered to accommodate transit <br />users at convenient locations. <br />• Days of Operation —The City should work with OCTA to consider <br />changes to route times to serve nighttime and weekend project visitors <br />and employees. <br />• Headway —The City should work with OCTA to review route headways <br />to determine if it would be appropriate to reduce them to accommodate <br />transit riders within the Overlay Zone. <br />MM-OZ 4.12-2 Future development within the proposed Overlay Zone shall prepare separate <br />traffic studies, specific to the individual projects that are proposed. The traffic <br />studies for future projects shall be prepared by a qualified traffic engineer of <br />the City's choosing. Further, and as determined by the traffic studies, the above <br />identified improvement measures shall be implemented as a condition of the <br />proposed development, either through the direct construction of improvements <br />by the project applicant or through payment of a fee, as required by the <br />program detailed in MM-OZ 4.12-4. <br />MM-OZ 4.12-3 The City of Santa Ana Planning Department, in cooperation with the <br />Department of Public Works, shall monitor the traffic signals within the Overlay <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 625 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.