My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Access <br />The Project would implement MM-OZ 4.6-7, requiring coordination with the City Fire Department <br />in preparation of an Emergency Preparedness Plan. Thus, the Project would not result in any new <br />or increased significant impacts related to emergency access beyond impacts already identified <br />in the Certified EIR. <br />Mitigation Measures <br />The Project would implement Mitigation Measures MM-OZ 4.4.12-1, MM-OZ 4.4.12-2, MM-OZ <br />4.4.12-4 and MM-OZ 4.6-7 from the Certified EIR, including the following specific improvements <br />identified in the site -specific traffic study prepared for the Project in accordance with Mitigation <br />Measure MM 4.12-2: <br />Cabrillo Park Drive/Fourth Street: Widen and provide the additional right-of-way required to <br />construct an exclusive westbound right -turn lane with 125-feet of storage and 90-feet transition. <br />Modify the existing traffic signal as necessary. <br />SR 55 SIB Ramps at Fourth Street: Modify the eastbound shared through/right-turn lane to <br />construct a free -right turn lane. Modify the existing traffic signal as necessary. This improvement <br />is subject to the review and approval of the City of Santa Ana, City of Tustin and/or Caltrans. <br />SR 55 NB Ramps at Fourth Street: Modify the eastbound approach to provide dual left -turn lanes <br />and two through lanes. Modify the existing traffic signal as necessary. This improvement is subject <br />to the review and approval of the City of Santa Ana, City of Tustin and/or Caltrans. <br />4.16.3 Any substantial changes in circumstances involving new significant impacts or <br />substantial increase in the severity of significant impacts that will require major revisions <br />of the Certified EIR? <br />No substantial changes in the circumstances related to transportation have occurred, and no <br />substantial new significant traffic sources have been identified within the vicinity of the Project <br />since the certification of the Certified EIR that would result in new or more severe significant <br />environmental impacts. <br />4.16.4 Any new information of substantial importance that demonstrates that the Project <br />would result in new significant impacts or substantial increase in the severity of significant <br />impacts? <br />There is no new information of substantial importance that has become available relative to <br />transportation that would result in new or more severe significant environmental impacts related <br />to transportation. <br />4.16.5 Mitigation Measures Addressing Impacts <br />The Project would implement Mitigation Measures MM-OZ 4.4.12-1 and MM-OZ 4.6-7 from the <br />Certified EIR. <br />Cabrillo Town Center City of Santa Ana <br />Technical Memorandum August 2023 <br />City Council 18 — 633 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.