Laserfiche WebLink
1. Statement of Qualifications <br />D. Understanding of Need/ Schedule of Delivery <br />Anser will provide its best professional advice and consultation in a timely <br />manner concerning construction management (CM), contract administration, <br />planning, organizing, implementing, monitoring, and managing the <br />construction of the City of Santa Ana's Capital improvement Projects. The City <br />contemplates a substantial Capital Improvement Program over the next several <br />years and the program will consist of a variety of construction projects. <br />Anser has reviewed the City of Santa Ana Capital Improvement Projects and <br />has identified potential projects for the on -call Professional CM support <br />services contracts. Projects are expected to include Street Improvements <br />(improvement of pavement conditions, sidewalk and alleys), Traffic <br />Improvements (evaluate traffic collisions and congestion, identify and map safe <br />routes to schools, and provide walkable and bikeable streets), utility/drainage/ <br />lighting improvements (delivery of water and sanitary sewer services to the <br />City's customers, address aging storm drain system and reduce storm water <br />runoff), and City and park facilities (identifying deferred maintenance and <br />capital projects to support facilities such as City Hall, Ross Annex, forty-seven <br />(47) parks, six (6) joint -use facility sites, thirteen (13) community centers, two <br />(2) tennis centers, five (5) municipal swimming pools, bicycle & recreational <br />trails and the Santa Ana Zoo. <br />The City requires its on -call CM consultant to support the City, represent <br />its interests, and lead the everyday efforts in the planning, entitlement, <br />design, construction, and oversight of assigned projects for various Capital <br />Improvements within the purview of the Public Works Department. <br />A successful project is achieved by fostering good relationships between <br />project team members, including City staff, the design firm, and the Contractor. <br />As the Owner's Representative, we will help establish good relationships with <br />all team members, creating efficient chains of communication and treating all <br />parties fairly and with respect. Our goal is for all parties to work cohesively as <br />one project team to make sure that the project is constructed to the required <br />quality, economic, and safety standards. Before we can accomplish these goals, <br />we must first understand the viewpoints of not only the City but also, just <br />as important, perspectives of the A&E firm. This allows us to analyze critical <br />situations from all views and work with the project team to develop the best <br />solutions throughout the project life cycle, from design to commissioning and <br />close-out. <br />E. Relevant Project Experience <br />WateP IZOIAler/Utilitie- <br />• City of Corona: Arantine Hills Sewer & Water Project I Prime Water <br />and Sewer Inspection Services <br />Anser has been providing inspection <br />services for the Arantine Hills project <br />for over a year. Project elements <br />"` r involve water and sewer pipelines, lift <br />T stations, reservoirs, streets, roadways, <br />streetlights, facilities, parks, land <br />development, and utility relocations. <br />- In addition to providing inspection <br />services, Anser staff coordinates with approximately five merchant builders <br />that requires regular and constant communication to coordinate overlapping <br />construction activities. <br />• Wardlow Park Community Center Roof Replacement ($750K) 2023 <br />-Current I Prime, JOC <br />This project will remove and replace the community center's existing gravel roof <br />system, HVAC equipment and furnishings, including additional water drainage <br />building improvements. <br />Anser will be providing <br />construction management <br />services throughout all <br />phases of this project. Anser <br />will provide part time support <br />to manage site work and all <br />project document control <br />management for the City of <br />Long Beach. Anser is currently <br />awaiting additional project <br />details to review plans and meet with the City to discuss finalized scope of work. <br />• City of Corona: Keith 1220-Zone Potable Water Storage Tank and <br />Pump Station Project <br />• City of Huntington Beach: Slater Lift Station I ($4M) <br />• City of Huntington Beach: Edwards/Varsity Water Main <br />Replacement) ($1.8M) <br />• City of Corona: Prado Dam Flood Inundation Utility Retro <br />CITY OF SANTA ANA I RFP NO: 23-122 7 1 Anser Advisory <br />