Laserfiche WebLink
E. Relevant Project Experience <br />1. Statement of Qualifications <br />of Long Beach: Davenport Park Phase II - Park Expansion <br />ter_ 4a ' s ' - 2024 IPrime <br />,($8.4M) 2023 <br />Construction Management <br />-- — This project will expand upon the existing <br />j 5.5-acre park to 11.5 acres of total park <br />area. The project will include a natural <br />"J turf sports field, lighting, outdoor seating, <br />fitness stations, walking trails, storm water <br />"'`, 'improvements, new landscaping, and a new <br />asphalt road and parking area. This project is currently in the pre -construction <br />phase and is part of a multiphase program to improve this site. Anser is actively <br />providing preconstruction planning and construction management services. <br />• City of Long Beach: El Dorado Park Artificial Turf Soccer <br />Field ($3.1M) March - September 20211 Multi -Prime, Project <br />Management <br />The project provided an artificial turf <br />soccer field with an integrated high <br />pressure cooling system, new portable <br />goals, new protective netting behind goal, <br />and new decorative fencing. New ADA <br />curb ramps, pathways, and parking was <br />added. Landscaping and site improvements <br />included trees, sod, irrigation, multiple <br />retention basins, field drainage network, <br />decorative etched boulders, sidewalks, parking lot speed bumps, and a new <br />hydration station. The project also included adding a new City meter, backflow, <br />and wi-fi landscape irrigation controllers. Anser completed $1.2M under <br />construction budget and on schedule and coordinated added scope for a new <br />water meter and backflow assembly. <br />• City of Long Beach: Admiral Kidd Park Playground Rebuild Phase 1 <br />($750K) 2022 - Current I Prime, Construction Management <br />• City of Long Beach: Recreation Park Playground Renovation ($1.9M) <br />2021 - 2022 1 Prime, Project Management <br />• San Gabriel Valley Council of Governments: Diamond Bar Golf <br />Course Improve ments($40M) I Prime, Construction Management <br />• Citywide ADA Parks Project ($440K) I Prime, Inspection Services <br />• Citywide ADA Parks Project ($440K) I Prime, Inspection Services <br />• San Diego: BayShore Bikeway -Barrio Logan Project ($18.4M) I <br />Prime, Inspection Services <br />CITY OF SANTA ANA I RFP NO: 23-122 <br />Buildings <br />• City of Long Beach: Michelle Obama <br />North Branch Library ($34.6M) 2012 - <br />2016 1 Prime, Project Management <br />The new LEED Silver certified North Branch <br />Library is a state-of-the-art 24,655 square -foot <br />single -story facility incorporating a historic <br />tower and associated site work and street <br />improvements. The new library includes areas <br />for children, teens and adults, as well as three public community meeting <br />spaces. Acting as an extension of City staff as the City's project manager, Anser <br />staff was responsible for the overall successful completion of the project. <br />• City of Los Angeles: LA Metro -Emergency Security Operations <br />Center ($1.1M) Prime Construction Management <br />The project consists of a minimum 80,000-square-foot, four -story -tall building <br />that will be built in phases. The first phase consists of the core and shell of the <br />building with a minimum of 91 at -grade parking stalls, ground floor lobby, EOC, <br />and new Security Operations Center (SOC) Im- <br />co-located on one floor. The second phase <br />will include the tenant improvements for <br />the Rail Operations center (ROC) and Bus IIIIII141j1j111111111 <br />Operations Center (BOC), and all associated <br />work. The project will achieve a Leadership <br />in Environmental and Energy Design (LEED) <br />v.3 Gold certification at a minimum, with ;�' <br />a target of LEED v.3 Platinum certification, ' <br />incorporating sustainable design features where appropriate, to minimize non- <br />renewable energy consumption, reduce waste, and conserve water. <br />• City of Long Beach: Emergency and Communication Center <br />($38.2M) Prime Construction <br />• City of Long Beach: Scherer Park Community Center Renovation <br />($1.5M) 2022 - Current I Prime, Construction Management <br />• City of Murrieta: Murrieta Senior Center Improvements Project <br />($400K) I Prime, Construction Management <br />• City of Murrieta: CIP 21-04 Fire Station No. 5 ($8.6M) I Prime <br />Construction Management, Inspection Services <br />• City of Signal Hill: Police Station & Emergency Operations Center <br />($9.1M) I Prime Construction Management <br />g I Anser Advisory <br />