My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:50:22 AM
Creation date
10/3/2023 11:28:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
10
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)>)) 2. Scope of Services and Schedule <br />inspection support during all the contractor's shifts. <br />d. Suggestions or Special Concerns <br />When it comes to project management, construction management, and <br />inspection of capital improvement projects in the City of Santa Ana, there are <br />several suggestions and special concerns to keep in mind. These considerations <br />are vital to ensure the success and timely completion of projects while <br />adhering to safety standards and legal requirements. <br />Below are some key points to consider: <br />1. Thorough Planning and Scope Definition: <br />Before starting any capital improvement project, conduct a detailed planning <br />phase to define the project scope, objectives, budget, and timeline. Engage <br />with stakeholders, including residents, businesses, and other relevant <br />authorities, to understand their needs and concerns. <br />2. Legal and Regulatory Compliance: <br />Ensure that all projects comply with local, state, and federal regulations, <br />including building codes, environmental regulations, and safety standards. <br />Obtain all necessary permits and approvals before commencing any <br />construction activities. <br />3. Risk Assessment and Mitigation: <br />Conduct a thorough risk assessment for each project to identify potential risks <br />and challenges. Develop effective risk mitigation strategies to minimize the <br />impact of potential issues on the project. <br />4. Budget and Cost Management: <br />Implement effective cost control measures to keep the project within budget <br />constraints. Monitor expenses closely and identify any cost overruns early on <br />to take corrective actions promptly. <br />S. Stakeholder Communication: <br />Maintain open and transparent communication with all stakeholders <br />throughout the project lifecycle. Regularly update them on project progress, <br />potential disruptions, and any changes to the schedule or scope. <br />6. Quality Assurance and Control: <br />Implement a robust quality assurance and control program to ensure that <br />construction work meets the required standards and specifications. Conduct <br />inspections at various stages to catch and rectify any defects or issues. <br />7. Safety Measures: <br />Place a strong emphasis on safety during construction. Ensure that all workers <br />are properly trained, follow safety protocols, and use appropriate personal <br />protective equipment (PPE). Regular safety audits and training sessions should <br />be conducted. <br />S. Environmental Impact: <br />Capital improvement projects can have environmental implications. Consider <br />sustainable practices, such as green building materials, energy -efficient <br />designs, and waste reduction strategies, to minimize the project's ecological <br />footprint. <br />9. Community Impact and Engagement: <br />Keep the local community informed about the project's progress, timelines, <br />and potential disruptions. Address any concerns they may have and involve <br />them in the decision -making process when appropriate. <br />10. Project Tracking and Reporting: <br />Implement a robust project tracking and reporting system to monitor progress, <br />identify deviations from the plan, and take corrective actions in a timely <br />manner. <br />11. Collaboration and Coordination: <br />Encourage collaboration and coordination among different project teams and <br />contractors to ensure smooth execution of the project. <br />12. Lessons Learned: <br />After project completion, conduct a <br />post -project review to identify lessons <br />learned and best practices. Use this <br />feedback to improve future capital <br />improvement projects. <br />e. Assumptions and/or Exclusions <br />Anser Advisory has no assumptions or <br />exclusions to include in our proposal. <br />CITY OF SANTA ANA I RFP NO: 23-122 <br />19 1 Anser Advisory <br />
The URL can be used to link to this page
Your browser does not support the video tag.