My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:50:22 AM
Creation date
10/3/2023 11:28:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
10
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)>)) 1. Statement of Qualifications <br />in the Caltrans Construction Manual will be implemented. The Anser team has <br />several office engineers and administrators who are experienced in utilizing the <br />Caltrans filing system and will establish and maintain the documents such that <br />they are accessible, orderly, and retrievable at any time for the Anser team, <br />City, Caltrans, and auditing personnel. <br />a. Anticipated Approach <br />A successful project is achieved by fostering good relationships between project <br />team members, including City staff, the design firm, and the Contractor. As the <br />Owner's Representative, we will help establish good relationships with all team <br />members, creating efficient chains of communication and treating all parties <br />fairly and with respect. Our goal is for all parties to work cohesively as one <br />project team to make sure that the project is constructed to the required quality, <br />economic, and safety standards. Before we can accomplish these goals, we must <br />first understand the viewpoints of not only the City but also, just as important, <br />perspectives of the A&E firm. This allows us to analyze critical situations from all <br />views and work with the project team to develop the best solutions throughout <br />the project lifecycle, from design to commissioning and close-out. <br />b. Necessary Tasks for Successful Completion <br />Anser's CM will be the main point of contact for the city during the construction <br />phase of the project. The CM will maintain all required project logs RFls <br />submittals change orders design bulletins as built documents pay applications. <br />Anser's CM will be responsible for execution of the construction phase of the <br />assigned project reporting directly to the project manager. In this role the CM will <br />be the eyes and the ears for the PM addressing many similar issues at field level <br />such as monitoring schedule construction activities quality control and budgets. <br />Field Observations - the CM will closely monitor the construction team and <br />ensure that all parties are working collaboratively and optimally. If a conflict arises, <br />the CM should reach out to the project manager to help resolve the conflict. <br />Monitoring Budgets, Reporting - the CM will monitor the construction contract <br />to ensure that the contractor is following all requirements identified there. These <br />tasks also include monitoring the construction budget schedule labor compliance. <br />The CM will also review the payment application from the contractor before <br />making final recommendations and approval for this PM's review. <br />Coordination - the CM will also be responsible for coordinating between <br />various city agencies and departments as well as outside third -party permitting <br />agencies to ensure compliance with all of the contract and permitting/ <br />inspection requirements. The CM must be knowledgeable of the plans and <br />specifications and have experience dealing with multiple tasks and be able to <br />coordinate effectively to ensure a positive project outcome. <br />c. Deliverables <br />The lifeblood of any project is the field inspectors. For the Construction <br />Manager, the inspection staff are the eyes and ears of the progress in the <br />field and are first to identify any issues that pertain to quality or compliance <br />with the contract. The Anser team has a robust team of road infrastructure <br />and bridges, facilities and structures, landscape, park, drainage, and utility <br />inspectors to support each City project. <br />Anser will ensure that our field inspectors are prepared with both hard and <br />electronic copies of plans, contact lists, copies of applicable specifications, and <br />standard plans, and have a full understanding of the scope of work they are <br />about to inspect. The assigned Construction Manager will be responsible to <br />sit down with each new inspector and give them an indoctrination on safety, <br />quality, compliance, traffic control, and any <br />other information they will need for their <br />assignment. <br />In addition, each inspector will be equipped <br />with the tools required to do their job. <br />These tools include a vehicle with safety <br />lighting, PPE, a laptop or Wad for their daily <br />reports, a cell phone, and a camera. Anser <br />inspectors always carry a tape measure with <br />them, as well as a notebook and pen. These <br />are the standard tools of an inspector and <br />must always be in the possession of the <br />inspector. Other tools that our inspectors will <br />be equipped with are a builders/laser level, <br />straight edge, measuring wheel, string lines, and stakes. <br />Our inspectors are ready to provide continuous inspection during the standard <br />eight -hour shift, but we recognize that the contractor's shift times may vary <br />due to the time of year or special operations. The Anser team will provide <br />CITY OF SANTA ANA I RFP NO: 23-122 18 1 Anser Advisory <br />
The URL can be used to link to this page
Your browser does not support the video tag.