Laserfiche WebLink
■ Prepare daily inspection reports (daily activity report, weekly <br />statement of working days) including photographs. <br />■ Measure and track quantities of satisfactorily completed <br />improvements. <br />■ Monitor contractor's implementation of approved traffic control <br />measures. Drive routes with active detours and/or lane <br />closures daily to confirm or require correction in compliance <br />with approved traffic control plans, WATCH Manual, Manual <br />on Uniform Traffic Control Devices (MUTCD) and/or Caltrans <br />Traffic Control Manual, as applicable. <br />■ Review items requiring corrective action with the contractor <br />and the City and develop punch list items and monitor <br />corrections made. <br />■ Issue field correction notices and respond to RFIs, <br />■ Prepare redline set of as -built plans. <br />■ Coordinate inspection activities with otherjurisdictions, if <br />applicable. <br />■ Strictly enforce requirements for health and public safety on <br />the project. <br />■ Perform inspection for line and grade, earthwork, grading, <br />excavation, backfilling of utility trenches, asphalt paving, <br />concrete form work reinforcement, and other related work. <br />■ Landscape architect review and approval of materials for <br />all landscape features on the project (plant/tree selection, <br />product submittal and sample reviews, irrigation installation <br />inspection and coverage test, proper installation and <br />plantings and maintenance). <br />■ Maintain a redline set of as -built (record) information. <br />■ Prepare project punch list at substantial completion and <br />follow-up. <br />Traffic Management Coordination. Ardurra will oversee proper <br />implementation of the traffic control plans by the contractor and <br />require corrections and diligent maintenance when required. <br />Ardurra will coordinate review of any traffic control plans required <br />to address special situations and monitor the contractor's <br />compliance with the Traffic Handling Plans, the MUTCD, or as <br />otherwise provided for in the specifications and in accordance <br />with Section 16.16 of the LAPM. Apparent conflicts with adjacent <br />or nearby projects will be addressed and coordinated. The <br />contractor will be required to clearly correlate traffic control <br />phasing in the CPM schedule work breakdown structure. Traffic <br />control will be a standard discussion and coordination item at <br />weekly progress meetings. <br />Daily Construction Observation Reports. Ardurra and/or the <br />deputy/specialty soils and materials inspectors will compile daily <br />observation reports documenting the contractor's workforce, <br />material and equipment used, a summary of construction <br />activities, field problems, disputes or claims, resolutions of issues, <br />and directions given to the contractor. Completed daily reports will <br />be transmitted to the City on a weekly basis. <br />Photographs. Ardurra prepares and maintains an electronic <br />photojournal documenting the construction progress. Photos <br />shall be taken before construction begins, during construction, <br />and upon completion of the project. <br />Weekly Statement of Working Days. Ardurra will prepare a <br />weekly statement of working days (WSWD), in conformance <br />with documenting the construction progress, time of completion, <br />delays and time extensions, and submit to the contractor and the <br />City on a weekly basis. The WSWD is typically discussed and <br />agreed upon at each progress meeting and transmitted as an <br />attachment to the minutes. <br />Pre -Final Inspection. The construction manager and inspector <br />will coordinate with appropriate project stakeholders, perform the <br />final job walk, and prepare the punch list (deficiency list). Ardurra <br />will coordinate, expedite, and observe completion of required <br />corrections, <br />Final Inspection. Satisfactory completion of all punch list items is <br />verified before Ardurra recommends processing of the Notice of <br />Completion. Ardurra is noted for attention to detail. Not only have <br />we excelled at closing out our own projects, but we have been <br />requested to and successfully closed out problem city projects in <br />which our services were not initially utilized. <br />Upon completion of the punch list and final sign off by all project <br />stakeholders, Ardurra will make recommendation to the City <br />regarding the contractor's final progress payment request and <br />prepare the final progress payment report for submission to the <br />City. <br />e. RELEVANT PROJECT EXPERIENCE <br />Our reputation for providing quality services has been confirmed <br />by our ongoing relationships and extended on -call contracts <br />with numerous agencies throughout the region. Our team's <br />experience, together with our constant team communication <br />and our quality control approach, has provided us with a solid <br />track record of meeting schedules, effectively adapting to <br />unforeseen challenges, and maintaining costs. Ardurra has <br />successfully delivered hundreds of projects to numerous public <br />agencies through our as -needed contracts —projects such as <br />road widening, street resurfacing and rehabilitation, drainage <br />improvements, traffic signals/safety enhancements, sidewalks, <br />pedestrian accessibility improvements, water and sewer <br />infrastructure, as well as facility and park improvements. Some <br />example assignments similar to the City's RFP are highlighted <br />below. <br />Proposal I City of Santa Ana 1 08-08-2023 <br />/\ ARDURRA <br />