Capital Improvement Projects CM & Inspection
<br />Anaheim, CA
<br />Client: City of Anaheim
<br />Contact: Jake Hester, Water Engineering and Design Manager;
<br />714.231.5625; jhester@a naheim, net
<br />Brenda Medina, former Anaheim Construction Contract
<br />Administrator (currently with UC Irvine); 714,679.1231
<br />Services: CM, Inspection, Contract Administration
<br />Start: 03/2017 Complete: Ongoing Project Value: $90M
<br />Ardurra provides CM services to oversee completion of more
<br />than $90 million in capital improvement projects involving
<br />telecommunications, structural, waterlwastewater, and utility
<br />undergrounding. Challenges have included existing utility
<br />conflicts and the coordination with outside utility companies for
<br />their existing utilities as they relate to the project. Our proactive
<br />approach, constant communication including several meetings
<br />prior to construction help facilitate and expedite permit reviews
<br />and approvals, as well as schedule of work coordination. Some
<br />representative projects include:
<br />■ Orangewood Avenue Improvements. Contract
<br />administration and construction management for this
<br />multi -faceted road widening project on Orangewood Avenue
<br />from State College Boulevard to the Santa Ana River. This
<br />project spans a largely commercial area within proximity to
<br />several freeways and highways along the south entrance to
<br />Angel Stadium of Anaheim. This widening project consists
<br />of electrical undergrounding with telecommunication lines
<br />relocation, installation of new City of Anaheim and City of
<br />Orange water mainline, traffic signal improvements, and
<br />a new variable message board. Widening improvements
<br />include roadway widening and paving, sidewalks, slough
<br />walls, curbs and gutters, retaininglblocklsoundwalls,
<br />driveways, cross gutters and spandrels, drainage
<br />improvements, catch basins, WQMP BMP improvements,
<br />Disney Resort -Style hardscape and landscaping, irrigation
<br />improvements, and signing and striping.
<br />■ Indiana Street Water Main Replacement. Contract
<br />administration and construction management for one of
<br />the City's first design -build projects, which consisted of the
<br />construction of approximately 2,400 Ll= of 6-inch ductile iron
<br />CL 52 zinc -coated water main, and 200 LF of 8-inch ductile
<br />iron CL 52 zinc -coated water main located along Indiana
<br />Street between Broadway and South Street. The project
<br />also included the replacement of fire hydrants, valves, water
<br />services, and appurtenant structures.
<br />■ Fire Station No. 5. Contract administration and construction
<br />management for the $5.4-million design -build construction
<br />of a 9,400-square-foot fire station on one acre. The station
<br />can house up to eight firefighters, Station design included
<br />parking, driveways, sidewalks, walls, fences, landscaping,
<br />water, sewer gas, telephone/cable and electrical utilities,
<br />transmissions lines and facilities. Winner of 2018 BEST
<br />Award from the Southern California chapter of the
<br />American Public Works Association.
<br />■ Citywide Sanitary Sewer Improvement Program/
<br />Projects, Group 6. Contract administration and
<br />construction management for $2-million project to build
<br />more than 4,200 linear feet of 24-inch,18-inch,l5-inch and
<br />10-inch vitrified clay pipe (VCP) sewer mainline. Project
<br />constructed 19 manholes, removing the existing mainline
<br />and manholes, rebuilding the street and installing new traffic
<br />loops, striping and pavement markers,
<br />Underground Conversion Plan Projects. Contract
<br />administration for three projects that are part of a City
<br />five-year program, The initiative is relocating overhead
<br />power and communications systems underground. The
<br />work is intended to improve aesthetics, replace antiquated
<br />equipment and enhance the reliability of the area's electrical
<br />system. Typical work includes undergrounding 69kV
<br />transmission and 12kV distribution systems, installing
<br />streetlights and service connections and demolishing
<br />overhead power, telephone and cable television lines.
<br />■ La Palma Water Complex — Reservoir Rehabilitation and
<br />Pump Station Replacement, Contract administration for
<br />$9.3-million reservoir and pump station project, Managed
<br />demolition of 3-mg reservoir and pump station. Directed
<br />rehabilitation of 4-mg reservoir, construction of new pump
<br />station and abandonment of inactive well.
<br />■ Rehabilitation of Pressure Regulating Stations (PRS)
<br />30 and 31 and Relocation of PRS-32 and -43 and
<br />Construction of New PRS-73. Contract administration and
<br />CM services for completion of various on -call water utilities
<br />projects for the Water Utilities Engineering group. The
<br />work consists of contract administration and construction
<br />management services for PRS 30, 31, 32, 43, and 73
<br />project, and construction management services overseeing
<br />the closeout of the PR-58, M-2 and M-8 projects,
<br />■ Gene Autry Way Widening. Construction management
<br />for this $6.8-million City of Anaheim project to widen and
<br />make significant related improvements to portions of the two
<br />arterials. The project, scheduled for 236 working days, is
<br />intended to make major strides in easing traffic congestion.
<br />/�/ ARDURRA
<br />Proposal I City of Santa Ana 1 08-08-2023