Laserfiche WebLink
offsite improvements included construction of a cul-de-sac <br />extension of 208th Street and widening of Crenshaw Boulevard <br />for a new right turn pocket and traffic signal improvements. One of <br />Ardurra's first tasks was a constructability review of the project's <br />plans (273 sheets) and specifications. Ardurra assisted the City <br />during the bid phase, coordinating responses to bidder questions, <br />substitution requests and compiling and issuing bid addenda, <br />Ardurra also assisted the City With evaluation of submitted bids, <br />as well as addressing a bid protest and assisting with preparation <br />for City Council award of the construction contract. Ardurra <br />construction phase services included assisting the City with <br />establishing an efficient web -based project administration portal, <br />and coordinating with a multitude of project stakeholders. Project <br />stakeholders include City Departments, utilities, adjacent property <br />owners, contractors and subcontractors, as well as the project <br />architect and subconsultants. Other tasks entailed performing <br />schedule and budget reviews, processing/coordinating RFI <br />responses, submittals and change management, <br />Signal Hill Dog Park <br />Signal Hill, CA <br />Client: City of Signal Hill <br />Contact: Kelli Tunnicliff, former Public Works Director <br />(currently City of Lakewood Deputy Director of Public Works); <br />562.209.0037; ktunnicliifglakewoodcity,org <br />Services: Construction Management <br />Start: 1112017 Complete: 03/2018 Project Value: $2M <br />Ardurra managed construction of a dog park for the enjoyment <br />of the area's canine residents and their owners. Dog park <br />features include new artificial turf, landscaping, a parking lot, and <br />sidewalks. The park is enhanced with play mulch, crushed -granite <br />walkways, seating, lighting, fencing, and drinking fountains. <br />Throughout the project, Ardurra's construction manager worked <br />closely with the City's inspector and public works director. As <br />part of construction management services, Ardurra provided <br />public outreach in the field, quality assurance of work performed, <br />participated in progress meetings, and ensured safe conditions as <br />well as compliance with plans and specifications. <br />Heritage Point Park & Stormwater Infiltration Project <br />Signal Hill, CA <br />Client: City of Signal Hill <br />Contact: Thomas Bekele, PE, Director of Public Works; <br />562,972.8516; tbekele@cityofsignalhill.org <br />Services: Construction Management <br />Start: 03/2021 Complete: 1112022 Project Value: $2.2M <br />Ardurra provided construction management services for this $2.2 <br />million park project. The project involved construction of a new <br />public park and stormwater infiltration system to restore a barren <br />brownfield area to provide much needed open space, wildlife <br />habitat, and environmental education opportunities. The project <br />also provided enhancement of the City's trail network for outdoor <br />recreation in an urbanized, industrial area. The passive new park <br />and miscellaneous related work included grading, oil operations <br />access roadway, a park entry monument and gate, stacked stone <br />retaining walls, drainage and 'infiltration system, hardscape, <br />decomposed granite walkways, passive park amenities, bollards <br />and lighting, irrigation, trees and planting, dog valet station, and <br />miscellaneous related work, Responsibilities Included submittal <br />and RFI reviews, conducting weekly progress meetings, <br />change order management inclusive of merit determination and <br />independent cost analysis and negotiation, payment applications, <br />overseeing and coordination of inspection and subconsultant <br />services for survey and geotechnical inspection, <br />Polliwog Park Lower Playground Replacement Project <br />Manhattan Beach, CA <br />Client: City of Manhattan Beach <br />Contact: Katherine Doherty, PE, ENV SP, City Engineer; <br />310.802.5352; kdoherty@manhattanbeach.gov <br />Services: Construction Management, Inspection <br />Start: 1012021 Complete: 05/2022 Project Value: $2M <br />Ardurra provided CM and inspection services for this project <br />that included the removal and replacement of play equipment <br />and the play surface, as well as fencing surrounding the lower <br />play area near the pond. The play structure was last replaced <br />with modernized equipment in 2003, so the existing playground <br />equipment and padded surface had become in a state of disrepair <br />due to the extensive wear and tear of heavy use by the public <br />over the last 18 years. And due to safety concerns, a substantial <br />portion of the existing play equipment was placed off limits to <br />users. In addition to revitalizing the play equipment and surface, <br />the project also involved replacing portions of sidewalk between <br />the play area and parking on Herrin Avenue and upgrading the <br />existing accessible parking stalls on Herrin Avenue in compliance <br />with current ADA standards. Ardurra worked diligently and closely <br />with all shareholders to expedite the submittal, plan check, and <br />approval of shop drawings and procurement of the shade sails in <br />an effort to meet the contractual deadline for project completion. <br />Firestone Boulevard Regional Corridor Capacity <br />Enhancements <br />South Gate, CA <br />Client: City of South Gate <br />Contact: Kenneth Tang, City Project Manager; 323.563.9574; <br />ktang@sogate.org <br />Services: Inspection <br />Start: 0112018 Complete; 0812019 Project Value: $20M <br />Ardurra conducted construction inspections for the City of South <br />Gate's $15-million overhaul of three segments of Firestone <br />/\\,/ ARDURRA <br />Proposal I City of Santa Ana 1 08-08-2023 <br />