My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:50:22 AM
Creation date
10/3/2023 11:28:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
10
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -Call CM/Iz <br />BELLFLOWER / SPRING BRIDGE REPAIR <br />City of Long Beach — 411 W. Ocean Blvd., 5th Floor, Long Beach, CA 90805 <br />Contact: Mr. Alvin Papa, Deputy Director of Public Works for the City of Huntington Beach (714) <br />536-5503 alvin.PaPa(a_surfcity-hb.orq Construction Cost: $500,000 A/E Fee: $25,000 (to date) <br />Dates: 2020 Role: Prime Construction Management / Inspection Contractor: Doty Bros. <br />Construction Company AKM Staff: E. Kayiran (PM) <br />AKM Consulting Engineers provided construction management and _-- - <br />inspection services for the Project which involved repair of a damaged - a <br />section of the Bellflower / Spring Bridge which also serves as a quadruple <br />box culvert under the road. The culvert was damaged by a Contractor <br />performing work at street grade for Southern California Edison (SCE) under <br />a City issued encroachment permit. Because the City had jurisdiction of the <br />bridge and street, and County of Los Angeles Flood Control District <br />(LACFCD) owns and maintains the drain age culvert, SCE's repair contractor <br />was required to obtain permits from both the City and LACFCD. The work <br />entailed constructing a diversion of dry -weather drainage flows away from the culvert chamber where <br />the repair was located, the erection of a designed falsework system within the culvert underneath the <br />location of the repair, the demolition and removal of a 25 by 15 foot section of the bridge/culvert, <br />sandblasting of existing reinforcement bar, doweling and epoxy setting new reinforcement into the <br />existing concrete and placement of new concrete. <br />The work required traffic control beginning at the 405 freeway as well as a full street closure during <br />concrete placement, which was performed at night. Due to the urgency to complete the work within <br />a dry weather window and relive the public of the burden caused by the work, Construction was <br />performed in both day and night shifts, 7 days a week. AKM rotated inspectors to adequately cover <br />the work which required close communication amongst the AKM team as well as all involved parties. <br />NORTH HEALTH FACILITY <br />City of Long Beach — 411 W. Ocean Blvd., 5th Floor, Long Beach, CA 90805 <br />Contact: Nancy Villasenor nancy.villasenor(c'Dlongbeach.gov (562) 570-3165 <br />A/E Fee: $160,000 Dates: 2020-2021 Role: Prime Construction Management / Inspection <br />Contractor: HHJ Construction AKM Staff: E. Kayiran (CM) <br />AKM Consulting Engineers provided construction management and <br />inspection for the North Health Facility in the City of Long Beach. The <br />project involves the rehabilitation of a City owned municipal building N ;n <br />which formerly housed the City of Long Beach's Health Department *•" <br />as well as a child day care. The building was not occupied at the - <br />start of the project and will ultimately be occupied by a health clinic <br />run by the City Health Department, as well as new offices for Health '' F <br />Department staff. The tenant improvements include removal and <br />replacement of the existing floor, asbestos abatement throughout the <br />entire facility, replacement of exterior windows, the construction of new partition walls, the relocation <br />and reconstruction of restroom facilities, the removal and reconstruction of kitchen facilities, <br />construction of a new HVAC system, wiring for new electrical receptacles and data ports throughout <br />the building, ADA improvements within the existing parking lot, the construction of a new roofing <br />system and replacement of the building's drop ceiling. <br />AKM Partnered with the City to implement a system of analyzing and providing recommendations for <br />the change orders submitted by the Construction Contractor. The system proved very effective in <br />eliminating change orders and claims that lacked merit. <br />AKM Prop. 23-1061 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.