Laserfiche WebLink
On -Call CM/I <br />AKM has entered into On -Call Contracts with the following agencies in the past 5 years: <br />• City of Fontana (2020-Current) - On -Call (Construction Management and Inspection) <br />• City of Paramount (2020-Current) - On -Call (Construction Management and Inspection) <br />• City of Santa Ana (2020-Current) - On -Call (Construction Management and Inspection) <br />• City of Corona (2019-Current) - On -Call (Inspection Services) <br />• West Basin MWD (2016-Current; Third Tern) - On -Call Construction Management <br />• Water Replenishment District (2018-Current) - On -Call (Construction Management Services) <br />• South Coast Water District (2020-Current) - On -Call (Construction Management and Inspection) <br />• City of Long Beach (2016-Current) - On -Call (Construction Management and Inspection Services) <br />• Ontario MUC (2016-Current) - On -Call (Engineering Services for Construction Management and <br />Insoection) <br />AKM Consulting Engineers has completed, and/or is currently working on construction management <br />assignments for the following clients. Contacts are listed for your reference to confirm the quality of <br />our work and responsiveness provided by AKM. <br />City of Long Beach — 333 W. Ocean Blvd., 9th Floor, Long Beach, CA 90802 <br />Contact: Colin Averill (562) 570-6679 colin.averill@longbeach.gov <br />Project: On -Call Construction Management and Inspection Services <br />Water Replenishment District — 4040 Paramount Blvd., Lakewood, CA 90712 <br />Contact: Mario Bautista (562) 275-4300 mbautista@wrd.org <br />Project: On -Call Construction Management and Inspection Services <br />West Basin Municipal Water District - 17140 S. Avalon Blvd., Suite 210, Carson, CA 90746 <br />Contact: Ms. Veronica Govea, Project Manager (310) 660-6269 veronicaq(a-),westbasin.orq <br />Project Title: On -Call Construction Management and Inspection Services <br />City Of Paramount — 16400 Colorado Avenue, Paramount, CA 90723 <br />Contact: Ms. Adriana Figueroa, Director of Public Works (562) 220-2100 <br />Project: Equipping of Well 16 and Treatment Plant <br />City Of El Segundo — 350 Main Street, El Segundo, CA 90245 <br />Contact: Ms. Floriza Rivera (310) 524-2361 frivera@elsegundo.org <br />Project: Various Street, Water and Sewer Improvement Projects <br />South Coast Water District - 31592 West Street, Laguna Beach, CA 92651 <br />Contact: Ms.Taryn Kjolsing (949) 499-4555 x 3171 tklolsing(@_scwd.org <br />Proiect Title: Lift Station No. 6 Forcemain Replacement Proiect <br />As previously mentioned in the scope of work section, AKM has a strong history of being able <br />to quickly respond and mobilize for resolution of all issues. AKM is able to do this by not over <br />committing our resources. We have analyzed our current workload and are offering an elite team <br />who will maintain the necessary availability for the life of the Contract. Additionally, responsiveness <br />is a hallmark of our team. We understand the importance of being responsive to our clients in <br />order to facilitate timely commencement, progress, and conclusion of the project. <br />While the project schedule will largely be driven by contractually required milestone dates, and the <br />construction schedule developed by the awarded contractor, AKM will maintain consistency in our <br />response timeframes to ensure we are playing an active role in advancing the project forward. The <br />following are our proposed response times or deliverable timeframes for the project. <br />• Response to Change Order Proposals: 1 to 3 business days depending on size, scope and <br />complexity of the change order. <br />• Submission of Daily Reports: All Daily Reports will be submitted by 9:00 AM the following <br />business day. In most cases, the Daily Report will be provided the same day. <br />AKM Prop. 23-1061 19 <br />