Laserfiche WebLink
807 aprucalaka Drive ICEAMEpvRablRe YvICAeInNs <br />Harbor City, CA 90710 Production Price List <br />333-T7F9433 Ice Rink & Event 23.4 <br />PRICE LIST / PRODI.CTION BUDGET <br />CATEGORY SUMMARY <br />Project No: Ice Rink & Event Production Price List 23.4 Prepared By: SWW Product Ice Rink Production <br />Title: Santa Ana Holiday lee Skating Rink Date: 717 Purpose: recreational ice rink installation <br />Production Dates <br />Location: <br />Open Dates: <br />TBD - Nov 20-30, 20D Revised: 9/5 <br />Plaza of the Flags, ONc Center, Santa Ana, CA Actual: <br />Dec 1 - 31, Z023 <br />DESCRIPTIOW Productio0 of portable Ice rink & ancillary equipment <br />Shipping & transportation, Installation, training <br />Induded Production elements: ke Resurtacer, Chiller rental <br />Included: lighting and sound equipment For ice rink <br />NOTES: Also included options: ice nick operations and maintenance <br />ASSUMPTIONS: Budget is based On ice surface size: 82' x 50' <br />Not included In this budget: tax, permits, all electricity and Bistro, water, wl-fi connectivity, security, , crane 0f needed) <br />toilets, trash, daily Cleaning service, First aid, event signage, ADA access, on -site storage <br />Unit Price <br />No. <br />❑1 Portable Ice Rink <br />Portable Ice Rink <br />$ 0.80 <br />4100 <br />Pump <br />1,954 <br />1 <br />Glycol, Uneq Insulation <br />$ 2.37 <br />4100 <br />Resurfacer-elecMc <br />$ 2,100 <br />1 <br />Snow Melt Equipment <br />$ 303 <br />1 <br />�2 Chiller Rental <br />Chiller rental package <br />$ 110 <br />200 <br />Delivery, install, pidmp <br />$ 2,500 <br />2 <br />33J Dasher Boards <br />PE Transparent <br />$ 3.85 <br />300 <br />®Other Ice Rink Equipment <br />Slates <br />$ 4.35 <br />275 <br />Helmets <br />$ 2.75 <br />30 <br />Slate Rack <br />$ 78 <br />6 <br />Slate Rack Shelves <br />$ 39 <br />1 <br />Skate Sharpener <br />$ 171 <br />1 <br />Extra thick plastic sheet <br />$ 0.25 <br />4100 <br />Skate aid "Bobby' & "Tommy" <br />$ 30.53 <br />25 <br />QS Installation, Training, Transportation <br />Rink installation <br />$ 3,675 <br />3 <br />Production fee <br />$ 25,210 <br />1 <br />Hotel for install crew/mgr <br />$ 150 <br />2 <br />Shipping &Trucking <br />$ 2,250 <br />2 <br />© Site Build -Out <br />Slate lace area rubber mats <br />$ 3.65 <br />1500 <br />Office bailer <br />$ 2,500 <br />1 <br />Tents <br />$ 1,750 <br />6 <br />Benches <br />$ 23 <br />10 <br />Railing / Barricade <br />$ 18.00 <br />20 <br />❑7 Levding Option <br />Platform <br />$ 1.15 <br />450D <br />Installation <br />$ 4.57 <br />450D <br />Slate lace area finish work <br />$ 14.95 <br />825 <br />Shipping &TmcWng Platform <br />$ 1,850 <br />3 <br />©Rink Lighting/Sound <br />Rink Sound package <br />$ 435 <br />1 <br />Rink Lighting package <br />$ 2,985 <br />1 <br />�9 Operations <br />Setup &Training Fee <br />$ 10,750 1 <br />General Manager fee <br />$ 3,675 1 <br />Maintenance fee <br />$ 2,950 1 <br />Weekly operations staffing fee <br />'Estimated payroll <br />$ 6,975 1 <br />Housing for GM & Ice Tech <br />$ 950 2 <br />Operations liability insurance <br />$ 0.95 1750 <br />Security <br />$ 39.50 <br />Ticketing Management <br />$ 2,000 1 <br />©HOLIDAY ICE RINK PRODUCTION W/SELECTED <br />OPERATIONS <br />Term Total Price <br />$ 51,452 <br />7 $ 22,960 provision of: 82' x SO' ice surface = appron 4100 sq.R <br />includes ICE -WORLD ice nnk elements, headers, header mvers <br />1 $ 1,954 sytem pump for glycol, etc. <br />1 $ 9,717 glycol, plastic sheet, insulation <br />7 $ 14,700 small electric ice resuriacer <br />7 $ 2,121 Heabex heating element & melt trough For snow melting <br />$ 43,500 <br />1.75 $ 38,500 monthly rental of chiller, pump, tank, extra Cables & equipment <br />1 $ 5,000 delivery, instanation, removal, startup <br />$ 8,085 <br />7 $ 8,085 recreational clear slating boards x number of feet <br />$ 20,065 <br />7 $ 8,374 Rom slates w/buddes <br />7 $ 578 helmets (s, in, 1) <br />7 $ 3,276 portable skate racks -collapsing with wheels <br />7 $ 273 shelves for in between portable racks <br />7 $ 1,197 EZ-Sharp or Wissota <br />1 $ 1,025 square feet required - for events only <br />7 $ 5,343 provision of slating aid "seal" and "reindeer' <br />$ 56,260 <br />2 $ 22,050 Rink installation supervisors & labor (in/out)/warehouse <br />1 $ 25,210 trawl, legal & admin, Production for install/removal/maintenance/ferHlRs <br />$ - loot - not required (supeMsois load -In and load -out hotel) <br />2 $ 9,000 estimated trucidng/shipping ice ink equipment <br />23,925 <br />1 $ 5,475 estimate for skate lace area rubber mats <br />2 $ 5,000 8' x 12' ticket office bailer <br />1 $ 10,500 tents for slate rental & waivers & VIP area w/lighting <br />5 $ 1,150 benches for slaters <br />5 $ 1,800 3'sections <br />$ 69,874 <br />5 $ 25,875 rental for specialized Ice rink low scaffolding platform <br />1 $ 20,565 supervisors & labor for platform <br />1 $ 12,334 ramps & rink platform carpentry, slate lace area finish work <br />2 $ 11,100 estimated trudang/shipping for platform <br />$ 23,940 <br />7 § 3,045 (6) outdoor speakers, console, amplifier, playback <br />cordless mic, cables <br />7 $ 20,895 lights, truss, board, light strings <br />$104,900 <br />1 $ 10,750 staff hiring, training, uniforms, management <br />5 $ 18,375 GM weekly rate (60 hrs/wk) <br />S $ 14,750 Ice Tech Mgr weeUy, rate (60 hrs/wk) <br />$ - variable staffing payroll fees <br />5 $ 34,875 'variable est billed payroll @ $30.00/Iv (sub) to dange based on actual his) <br />5 $ 9,500 to be determined or provided by sponsor <br />4 $ 6,650 estimate special event Insurance to operate ice nnk at $ .95/slater <br />$ - CITY TO PROVIDE: required 2417 security staff from load -in through knot awt <br />5 $ 10,000 40hrs/wk treating management sk Mce <br />402 001 includes items listed in 1-8 &7tals above only <br />OPTIONAL ICE RINK ADD -ON EXPENSES <br />E0 Levding Options - Extended Deck <br />$ 24,340 <br />Platform <br />$ <br />1.15 2000 <br />5 $ 11,500 rental for specialized ice rink low scaffolding platform <br />Installation <br />$ <br />4.57 2000 <br />1 $ 9,140 supervisors& labor for platform <br />Slate lace area finish work <br />$ <br />13.75 <br />$ - ramps & inkplatform Carpentry, skate lace area finish work <br />Shipping & Truclang Platform <br />$ <br />1,850 1 <br />2 $ 3,700 estimated truclong/shipping for platform <br />D I HOLIDAY ICE RINK PRODUCTION W/OPERATIONS, EXTENDED DECK 426 343 includes Items listed in all totals above only <br />