Laserfiche WebLink
(a SCOPE OF WORK <br />7. All waste on -site is to be managed and removed by the contractor at the end of each <br />work day. If space is needed onsite, this will be discussed and the location of container <br />placement will be pre -determined by the City. <br />8. Contractor is solely responsible for the cost of, and for hiring any subcontractors <br />required for this job, including for any materials testing and inspection if needed. <br />9. Any removal of trees, roots, or stumps should be included in Contractor's lump sum <br />bid pricing submission. <br />10. Contractor may use park restrooms when restrooms are open. Locations of portable <br />restroom and storage will be determined between the City's Project Manager and <br />Contractor upon project start date. <br />11. Chain link fencing with privacy screen cover and the specific type of fencing is <br />required. All fencing and related materials must be approved by the City prior to <br />installation. <br />City of Santa Ana IFB No. 23-117A Page 11 of 21 <br />