My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />ATTACHMENT <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />FAIRVIEW BRIDGE REPLACEMENT AND <br />STREET IMPROVEMENTS (9TH ST. TO 16TH ST.) <br />RFP NO.23-020 <br />INTRODUCTIONBACKGROUND <br />The City of Santa Ana has in its budgeted Capital Improvement Program to improve Fairview <br />Street Bridge Replacement and Street Improvement from 91h Street to 16th Street (Project). <br />Fairview Street is a regionally significant arterial roadway, providing north -south travel corridor. <br />Currently, this roadway provides three lanes in each direction south of 9th Street and north of 16th <br />Street. The segment between 9th Street and 16th Street is reduced to two lanes in each direction. <br />The project includes widening Fairview Street from 9th Street to 161h Street, including replacing <br />the Fairview Street bridge crossing over the Santa Ana River (refer to Figure I and 2). The Project <br />would widen Fairview Street from two lanes in each direction to three lanes in each direction. <br />Fairview Street Bridge would be replaced with a new six -lane bridge (three lanes in each direction), <br />including a complete bridge deck with decorative barrier rails, divided railing for shared <br />pedestrian/bike path, a raised median, and lighting (refer to Figure 3). <br />The proposed bridge would be expanded from approximately 52 feet to 100 feet in width, and <br />would have the same roadway profile as the existing bridge. The eight pier walls that support the <br />existing bridge would be removed, and four new pier walls would be constructed to support the <br />new bridge (refer to Attachment 4 for complete set of plans and specifications). <br />All proposed right of way acquisition and easement have been completed. The anticipated <br />construction cost for this project is between $25M to $30M. <br />Note: Selected Consultant will have access to the latest documents once the RFP has been <br />awarded. <br />SCOPE OF WORK <br />The City of Santa Ana (City) is inviting proposals from experienced and responsive consultants <br />(Consultant) to review and handle the project construction plans for completeness and <br />constructability, the technical specifications and special provisions, the work quality and cost <br />estimates, pre -construction tasks upon City Council construction project award to a contractor, <br />inspections, construction management duties, and managing all construction activities and <br />City of Santa Ana RFP 23-020 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.