Laserfiche WebLink
schedule for timely work completion. All work will be conducted and prepared in accordance <br />with City and/or Caltrans practices, regulations, policies, procedures, manuals, and standards, as <br />appropriate and includes compliance with Federal Highway Administration requirements through <br />project closeout. <br />The Consultant shall provide sufficient number individuals to act as Construction Manager (CM), <br />Inspector(s), and a Contract Administrator (CA), and serve as an extension of City staff to timely <br />assist in the overall delivery of this Project. The Consultant team will report directly to the City's <br />Project Manager (PM) or his/her designee authorized representative. City staff will oversee the <br />work of the Construction Manager, Inspector, and Contract Administrator. <br />The CM shall be a registered Civil or Structural engineer in the State of California and shall represent the <br />City Construction Manager in the field. The CM shall possess a minimum of (5) years' experience in bridge <br />construction management. The Inspector and the Contracts Administrator should have relevant experience <br />in construction management and certifications that affirm their experience. <br />Consultant Responsibilities <br />The Consultant's responsibilities shall include the following project tasks: <br />Task I: Pre -construction Services <br />Objectives: <br />Perform a review of a previously completed constructability review of the Project; analyze the phasing <br />and staging of project construction for conflicts and to minimize the disruption to traffic; review of the <br />Project Plan, the Project Specifications, Estimates, applicable permits, and technical reports for the <br />Project is required for a thorough understanding of the project before advertisement; and provide <br />support during bidding and prepare Caltrans pre -award package. <br />The pre -construction services including, but not limited to, the following: <br />1. Provide a thorough review of the previously completed constructability review and provide any <br />comments and/or recommendations to ensure all comments are met and up to date. <br />2. Provide a thorough review of the construction sequence necessary to complete the improvements <br />included in the construction contract. <br />3. Review potential utility conflicts and identify items requiring coordination with third party utility <br />agencies. <br />4. Review measurement and payment sections of the Specifications to ensure that the proposed work <br />specified is covered by a bid item and identify any missing and/or redundant pay items. <br />5. Perform an Independent Quantity Take -off of all items of work on the Project and make updates to <br />engineer's estimate for current unit pricing. <br />6. Update and modify the cost estimate and contract documents according to the findings. <br />7. Prepare and submit an itemized list of findings and outline recommendations to reconcile issues <br />discovered and generally to expedite the project. If it is more efficient to make changes directly on <br />the contract documents, then show changes made on the documents. <br />City of Santa Ana RFP 23-020 <br />Page Al -2 <br />