My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 2: Construction Management, Inspection, and Contract Administration Services <br />Objectives: <br />Perform a complete construction management services including inspection and contract administration <br />for the construction contract document in conformance with the requirements set forth in the State's <br />Construction Manual, State's Local Assistance Programs and Procedures Manual, OCFCD <br />encroachment permit/requirements, and other Agencies regulatory permits/requirements. The <br />expectation of the Construction Manager is to enforce the contract requirements, comply with Federal <br />funding guidelines/requirements, and maintain the project schedule for timely work completion. <br />1. Review of completeness and quantity of all required shop drawings, product data, samples, requests <br />for information (RFI), and other submittals ("Submittals"). Shall review, reject, approval of mix <br />designs and materials and product submittal. Shall establish and implement procedures for <br />expediting the processing and approval of Submittals. <br />2. Use of Procore software for all aspects of construction management, including, but not limited to, <br />submittals, RFI's contract documents, inspections, drawings, photos, dailies, and weeklies, City <br />will provide license to CM team to monitor and implement. <br />3. Lead pre -construction meeting and schedule and conduct weekly construction and progress <br />meetings to discuss such matters as procedures, progress, problems and scheduling. Will prepare <br />and promptly distribute minutes. <br />4. Attend and co -lead up to twenty (20) hours of Construction Update meetings with the community, <br />including a pre -construction meeting. Primary purpose of these meetings are to provide pertinent <br />updates to the community and answer any questions relating to the construction project. <br />5. Ensure that all regulatory permits, including, but not limited to: 1) USACE Section 408 permit, <br />Section 404 Permit, Section 106, OCFCD, etc. are current and up to date, and that all applicable <br />fees have been paid, and shall obtain approvals from authorities having jurisdiction over the Project. <br />Consultant shall set aside a budget for permit fees as part of this contract. <br />6. Review construction schedule, including activity sequences and duration, schedule of submittals <br />and schedule of delivery for products with long lead-time. Monitor and obtain two -week look ahead <br />schedule as well as overall updated schedule from the contractor periodically showing current <br />conditions and revisions required by actual progress. <br />7. Conduct comprehensive evaluation of change order requests, provide independent estimates, <br />negotiate, render recommendations, and assist in claim resolution. Shall regularly monitor and <br />report on the status of the Project Construction Budget on a monthly basis, indicating actual costs <br />for completed activities and work in progress, and indicating estimates for uncompleted work. <br />Report should identify variances between actual and budgeted or estimated costs, and shall advise <br />the City whenever it appears that the Actual Construction Cost has exceeded, or will exceed, the <br />Project Construction Budget for the entire Project or any Project Component. <br />8. Monitor the contractor's safety program. Take necessary steps to ensure the jobsite conditions are <br />in compliance with OSHA regulations. <br />9. Monitor and enforce traffic controls and detours. Coordinate in advance of any road closure or <br />detours. <br />City of Santa Ana RFP 23-020 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.