Laserfiche WebLink
8. Conduct site visit/field reviews as part of the plan review to identify any current field conditions <br />not reflected on the Plans. <br />9. Identify the elements of construction that could be substituted with more efficient materials and <br />associated methods. <br />10. Review of Geotechnical report and the structural calculations for the purposes of the expected <br />constructability review. <br />11. Review of the NEPA and CEQA documents for purposes of the expected constructability review <br />and expectation of the Project. Ensure all environmental compliance are met and included in the <br />Project contract document of the following, but not limited to the Mitigation Monitoring and <br />Reporting Program, (MMRP), Environmental Commitments Record (ECR), and permitting agency <br />guidelines and their Special Provisions. It is the Consultant's responsibility to bring on board <br />environmental sub consultant to prepare any pre -construction report/work plan and monitor <br />contractor's mitigation compliance work performed. <br />12. Review of all regulatory permits, either already approved or currently in review, to ensure all <br />permits are met for the Project. It is the Consultant's responsibility to take over any permits that <br />are currently in review (County and Army Corps of Engineer). <br />13. Review project phasing/detouring for construction in order to meet the Army Corps of Engineers <br />and Orange County Flood Control District (OCFC) permission to perform work in the riverbed. <br />14. Provide recommendations for special material testing and inspection that will be needed during the <br />construction phase. Consultant shall bring on board and set aside a budget for material testing and <br />inspection for the duration of the Project. <br />15. Provide an updated and reasonable construction schedule. <br />16. Provide support during bidding period, including addenda and answering any questions from <br />bidders, and attend pre -bid job walk, if required. <br />17. Analyze the bids for accuracy, identify the lowest responsive bidder, check for references, and <br />review all bid forms. <br />18. Prepare agenda and conduct pre -construction "kick-off meeting". Coordinate and invite contractor, <br />all agencies, and utility companies involved in the Project. <br />19. Prepare federally funded project pre -award package using Caltrans Local Assistance Procedures <br />Manual documents and forms. <br />20. Provide and maintain all meeting minutes and notes. <br />City of Santa Ana RFP 23-020 <br />Page Al-3 <br />