Laserfiche WebLink
Additional Project Considerations <br />In addition to the specific features related to <br />construction of the Project outlined above, our team <br />also understands the following Project elements that <br />require special consideration in order to minimize <br />impacts to the public. <br />0 Utilities to be Relocated <br />• Relocate AT&T Conduits (bank of 12) for future <br />use. <br />- From existing to slightly east of the existing <br />location <br />• Relocate city 12-inch water during Stage 1 <br />construction and move back to existing location <br />during Stage 2 construction. <br />- Incorporate a temporary 12-inch HDPE bypass <br />during construction along bridge deck removal <br />line. <br />- 25'x10' jacking/receiving pit at each abutment. <br />Shoring requirement. <br />® Community Outreach <br />The Fairview Street bridge spans the Santa Ana <br />River. The SART (Class I bikeway and an off-street <br />bikeway) runs on the east side of the Santa Ana <br />River. In addition, Fairview Street is surrounded by <br />a variety of property types, including single-family <br />and multifamily residences, parks, restaurants, <br />commercial uses, light industrial uses, and vacant <br />lands. Specifically, the residence access to the north <br />of the project onto W. 16th Street and to the South <br />onto W. 12th Street will be impacted during the <br />construction staging. <br />The SYRUSA Team has partnered with Connect <br />& Company (Connect) to be an extension of the <br />City's public outreach liaison and provide staff <br />and presentation material for outreach meetings. <br />Connect is currently providing community outreach <br />for two bridge replacement projects in Riverside <br />County, the $71 million Hamner Avenue Bridge and <br />Widening project and the $133.4 million Jurupa <br />Road Grade Separation project in Jurupa Valley. <br />Connect developed and is implementing the <br />community outreach plans, is working closely with <br />the local cities to provide project information and <br />related traffic impacts to residents, businesses and <br />visitors. Exhibit D.2 includes two examples of social <br />media posts from these projects. <br />SYRUSA <br />Exhibit D.2: Community Outreach Examples <br />®.. =i.©0 <br />Is Public Transportation <br />SYRUSA's team will coordinate with the Orange <br />County Transportation Authority (OCTA) to minimize <br />any disruption to its operations. OCTA Bus Route <br />47 travels North and South on Fairview Street, <br />Monday -Friday from 4:37 am to 11:18 pm and <br />Saturday, Sunday & Holidays from 5:27 am to 10:16 <br />pm. OCTA will be notified of temporary traffic control <br />that might affect its service. <br />Bus stops are located at: <br />Fairview -Westminster for Northbound stop 47 and <br />Southbound stop 47 <br />Fairview-12th for Southbound stop 47 <br />Fairview -Civic Center for Northbound stop 47, <br />47A and Southbound stop 47 <br />0 Emergency Services <br />There will be temporary traffic control and changes <br />in lane configuration during the construction staging <br />along Fairview Street, which could delay emergency <br />response times. SYURUSA's team will communicate <br />temporary lane closures and prior to each traffic <br />switch of the construction staging with the OCFA <br />and SAPID. <br />The City contracts the Orange County Fire Authority <br />and we will coordinate with the following local fire <br />stations adjacent to Project: <br />• OCFA Station 71, East on 17th St. <br />• OCFA Station 83, Northwest on Trask Ave <br />• OCFA Station 73, South on Franklin St. <br />• OCFA Station 78, Southwest on Newhope St. <br />PAGE 115A <br />