My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUGGESTIONS OR SPECIAL CONCERNS <br />SYRUSA has identified the following suggestions and special concerns that improve the Project overall. <br />Santa Ana River Bike and Hiking <br />Trail Detour <br />The contract documents require a sign at the SART <br />closure. SYRAUA suggests using a graphic to help <br />communicate the detour that is user friendly with <br />dates, graphics, in multiple languages, and not an <br />engineering plan sheet. Fairview Triangle Habitat <br />Restoration Park has a map now. We suggest <br />adding a detour map at the park, during SART <br />closures. Our communications and public outreach <br />subconsultant, Connect, specializes in creating <br />similar materials for the community and can assist <br />the City with this. <br />Hydrant Access <br />Stage 2 of the Project closes access to W. 16th St. <br />from N. Fairview St. There is a fire hydrant located <br />on the northwest corner that presents a challenge <br />and an opportunity. The challenge is that the fire <br />hydrant will be restricted in this construction work <br />area. The SYRUSA team will coordinate with first <br />responders of the limited access to fire hydrant <br />during Stage 2, by providing advance notice of <br />reduce access and durations. The opportunity is <br />that this is a great location for the Contractor to <br />install a water meter. <br />PAGE 124A <br />SYRUSA* <br />
The URL can be used to link to this page
Your browser does not support the video tag.